Repair of district roads in the Miechów County area divided into 4 tasks as part of eliminating the effects of events bearing the characteristics of a natural disaster

Remont dróg powiatowych na terenie powiatu miechowskiego z podziałem na 4 zadania w ramach usuwania skutków zdarzeń noszących znamiona klęski żywiołowej

Poland · Miechów · how to bid here →

Your path to submission

  1. Deadline: 9 October at 10:00 — 3 days left.
  2. You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
  3. Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

Clement What the numbers say about this buyer

  • In this sector the buyer awards roughly every 3 months (55 awards, most recently May 2026) — by that rhythm the next award was due around August 2026. The last award went to SALTOR Sp. z o.o..n = 55
  • 48% of this buyer's awards went to companies that had already won here before (95 awards since 2018, spread over 47 companies). 52% went to new names.n = 95 awards since 2018
  • Not one of the 95 awards with a known winner country has gone to a foreign company so far. Sector average: 0%.n = 95

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.
The Russia sanctions declaration (Art. 5k) comes with nearly every procedure — a formality, but missing it means exclusion.

Foreign bidders

In Poland · Construction work, 139 contracts went to foreign companies over the last 3 years (of 193,358 recorded awards) — mostly from Germany, Spain, France.

Typical field: median 5 (from 4,943 awards).

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

What the buyer is looking for

1. Renovation of district roads in the district of Miechów divided into 4 tasks as part of the removal of the effects of events constituting a natural disaster: Zad.1 Renovation of the district road No 1184K Uniejów Kolonia – Pstroszyce II in Uniejów Parcela, Uniejów Kolonia in km 0+000 - 0+072 and in km 0+132-1+620; Task 1 will be implemented with funds from the special-purpose reserve of the state budget to co-finance the implementation of tasks related to the removal of the effects of events constituting a natural disaster. In accordance with Article 310 of the Public Procurement Act, the contracting authority provides for the possibility of cancelling the procurement procedure if the public funds that the contracting authority intended to allocate to finance part or all of the contract are not granted to it. 1. The subject of the contract is the execution of construction works…

Show full description

… related to Zad.1 Renovation of the district road No 1184K Uniejów Kolonia – Pstroszyce II in Uniejów Parcela, Uniejów Kolonia in km 0+000 - 0+072 and in km 0+132-1+620 The subject of the contract includes: Preparing WORKS  shearing the sides mechanically, thickness up to 10·cm, BITUMICZNA WARSTWA  execution of abrasive profile-reinforcing waist made of asphalt concrete, thickness 6 cm for KR3 movement BROADWAY  execution of sides made of crushed stone aggregate, mechanically stabilized thickness 7 cm, width. 0.75 m 1.2. The subject of the contract is described in detail in (for task 1): 1) the technical specifications for the execution and acceptance of the works, 2) the specifications for the contract, 3) an extract from the project documentation 4) the bill of quantities of the works. In the event of discrepancies or inaccuracies in the records of individual documents included in the procedure documentation, it is assumed that the data were correctly presented according to the hierarchy of documents resulting from the order in which they were listed above. The pre-measures attached to the FTZ are for information purposes only and are ancillary to the evaluation of the offer. After consulting the design documentation and other documents of the procedure, the contractor is obliged to determine the scope of works necessary to achieve the result. 3. The Contractor is obliged to perform the subject of the contract using his own equipment and materials. 4. The contractor is obliged to separate and secure the site of the works. 5. The contractor is responsible for carrying out the works, partial acceptance (if applicable) and organisation (OSH, firefighting, and coordination in the field of OSH) on the site of the works. All activities should be carried out and performed on the basis of current standards and regulations. 6. It is recommended that the contractor carries out an on-site inspection at the construction site and obtains all the information that may be necessary to prepare the tender. A vision is recommended but is not a necessary condition for submitting an offer within the meaning of Article 131(2) of the Act. 7. Designation of the subject of the contract according to the Common Procurement Vocabulary (CPV): Task 1 45000000-7 Construction work 45233142-6 Road repair work 8. The contracting authority does not reserve the possibility of applying for a contract only by the contractors referred to in Article 94 of the Public Procurement Act. 9. The Contracting Authority shall require, pursuant to Article 95, in respect of employment by the Contractor or a subcontractor on the basis of the employment relationship of persons performing activities within the scope of performance of the subject-matter of the contract, if the performance of those activities consists in performing work in the manner specified in Article 22(1) of the Labour Code of 26 June 1974 (Journal of Laws of 2025, item 277 as amended) requires that: 1) throughout the duration of the works, the contractor or subcontractor employed on an employment contract all natural workers performing construction works, including the operation of construction machinery and equipment, directly related to the performance of construction works, this requirement does not apply to persons: construction managers, surveyors, suppliers of building materials, etc. 2) the number of employees necessary to perform the subject of the contract is determined by the contractor or subcontractor taking into account t

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

BuyerZARZĄD DRÓG POWIATOWYCH W MIECHOWIE
TypeWorks
Estimated valuenot published — common for below-threshold procedures
Published24 September 2026
CategoryConstruction work · CPV 45000000-7

Who has won here before

CompanyAwardsPeriod
Colas Polska Sp. z o.o.102021–2026
Zakład Robót Drogowych DUKT Sp. z o.o.92021–2025
PRODIM SP. Z O.O.42024–2026
P.P.H.U. BUD-RYS Łukasz Bazior42025–2026
Firma Transportowo-Usługowa "Trans-Instal" Wiesława Woźniak42022–2025
From 18.0M documented awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this

20213
20225
202313
202412
20256
202611

Who knows the rhythm prepares instead of reacting.

·
days until the deadline — Friday 9 October at 10:00

How to bid

Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.

Read the full notice — Original + documents
Goes directly to this tender on eZamówienia. The full specification and all annexes are there.