Modernisation of the central heating installation in the Social Care Home building in Dolice
Modernizacja instalacji centralnego ogrzewania w budynku Domu Pomocy Społecznej w Dolicach
Poland · Stargard · how to bid here →
Your path to submission
- Deadline: 9 October at 10:00 — 4 days left.
- You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 5 months (8 awards, most recently August 2026) — the next award is due around January 2027 by that rhythm. The last award went to SOLID-STET Sp. z o.o. Sp. komandytowa.n = 8
- 19% of this buyer's awards went to companies that had already won here before (59 awards since 2015, spread over 46 companies). That is well below the sector norm (44%) — this buyer switches suppliers more often than others.n = 59 awards since 2015
- The median procedure drew 4 bids (5 procedures with a bid count); 0% ended with a single bidder. Sector: median 5 bids.n = 5
- Not one of the 59 awards with a known winner country has gone to a foreign company so far. Sector average: 0%.n = 59
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Poland · Construction work, 139 contracts went to foreign companies over the last 3 years (of 193,358 recorded awards) — mostly from Germany, Spain, France.
Typical field: median 5 (from 4,943 awards).
What the buyer is looking for
1. The subject of the contract is modernisation – replacement of the central heating system in the building of the Social Welfare Centre in Dolice. 2. The scope of this contract includes: 1) preparation, demolition, dismantling works, 2) execution/replacement of central heating installations (without replacement of the heat source: gas boiler room unchanged) together with the replacement of radiators, 3) accompanying works necessary for the proper performance of the works covered by this contract. 3. The detailed scope of works is determined by the FTZ and the technical documentation.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| COMPENSA TOWARZYSTWO UBEZPIECZEŃ S.A. VIENNA INSURANCE GROUP | 3 | 2022–2026 |
| Agencja Usługowo - Handlowa "BEST" Spółka z o.o. | 2 | 2023–2024 |
| AGRO UBEZPIECZENIA - TOWARZYSTWO UBEZPIECZEŃ WZAJEMNYCH | 2 | 2024–2026 |
| Zakład Ogólnobudowlany Wiesław Kachniarz | 2 | 2021–2025 |
| Bio Star Spółka z ograniczoną odpowiedzialnością | 2 | 2023–2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.