Modernization of the swimming pool hall in the recreational pool section and construction of a paddling pool with water attractions for children
Modernizacja hali basenowej w części basenu rekreacyjnego oraz wykonanie brodzika z atrakcjami wodnymi dla dzieci
Poland · Redzikowo · how to bid here →
Your path to submission
- Deadline: 13 October at 10:00 — 10 days left.
- You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- 50% of this buyer's awards went to companies that had already won here before (9 awards since 2024, spread over 5 companies). That is well above the sector norm (23%) — newcomers have a harder time here than elsewhere.n = 9 awards since 2024
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 27/09/2026.
Foreign bidders
In Poland · Mining & construction machinery, 22 contracts went to foreign companies over the last 3 years (of 3,260 recorded awards) — mostly from Czechia, Belgium, Germany.
Typical field: median 3 (from 867 awards).
What the buyer is looking for
1. The main assumption of the planned modernization of the swimming pool hall is the release and transformation of a part of the recreational pool basin (previously acting as a water slide dynamometer) for recreational and rehabilitation purposes along with the creation of a new zone of water attractions for children in the form of a swimming pool paddling pool. 2. The scope of the order includes flooring and finishing works (including laying pool foil), as well as the delivery, assembly and inclusion of new water attractions for children in the pool technology. 3. The pool tray will be made by laying two walls together with their insulation and covering with pool ceramics. In one, from the pool side, a linear drain of stainless steel should be made. Then supplement the pool tiles, level the floor and line the pool foil with a thickness of 1.5 mm in light blue, protected by two layers of…
Show full description
… acrylic coating. 4. After completing all the work, the installation and installation of purchased water attractions for children should be carried out. Installation in accordance with the manufacturer's recommendations, if not in agreement with the supervisory inspector. 5. Scope of construction works: 1) in order to perform the above task, it is necessary, in particular, to construct 2 walls with a length of 8 m and a height of 30 cm limiting the area of the shower tray – the location indicated in the attached drawing – Annex 10 to the SWZ. 6. Scope of hydraulic works: 1) hydraulic works will involve connecting attractions to the existing pool water treatment plant in the sub-basin part. Installation length about 80m. Water supply through glued pipes, adapted to the existing system. The traditional method of drainage, drilling through the reinforced concrete ceiling (beach) and selecting a new pump as needed, 2) the given installation lengths are indicative and may change depending on the actual connections of the implementation conditions. It is allowed to move the location of individual water attractions within 50 cm in relation to the documentation, after prior agreement with the Ordering Party. 7. Scope of assembly works: 1) in order to perform the above task, it is necessary to perform in particular: a) making a swimming pool tray: construction of anti-moisture insulation of bricked walls with installation of the injection hose and its filling, waterproof mortars (cement sludges) ceramic linings of bricked walls from pool tiles, construction of overflow gutter on one side with overflow grille, preparation of the substrate for the pool foil, lining with pool foil of the shower tray, sealing of toys, installation of stainless steel arch railing on the river wall, b) delivery, installation and launching of water attractions for children – 11pcs. 8. The subject of the contract has been described in detail in accordance with Art. 1 of the Public Procurement Act by means of design documentation, bill of quantities and STWiORB, which are annexes to the FTZ
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Spółdzielnia Socjalna "Bociek" | 2 | 2024–2025 |
| Firma Usługowa Klaudia Wiśniewska | 2 | 2025–2026 |
| FUNDACJA D.T.SPORT | 2 | 2024–2025 |
| H2O KRZYSZTOF BRUDECKI | 2 | 2025–2026 |
| „PAWEŁ GADOMSKI RESCUE AND SWIM”, | 1 | 2025 |
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.