Friedrich & ClementBETA

Expansion of the cycling sports zone in Suble Park (BO). - II proceedings

Rozbudowa strefy sportów rowerowych w Parku Suble (BO). - II postępowanie

Poland · Tychy · how to bid here →

Your path to submission

  1. Deadline: 13 October at 09:00 — 7 days left.
  2. You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
  3. Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

Clement What the numbers say about this buyer

  • In this sector the buyer awards roughly every month (150 awards, most recently August 2026) — by that rhythm the next award was due around September 2026. The last award went to BUDOTECHNIKA Sp. z o.o..n = 150
  • 45% of this buyer's awards went to companies that had already won here before (305 awards since 2021, spread over 168 companies). 55% went to new names.n = 305 awards since 2021
  • Not one of the 305 awards with a known winner country has gone to a foreign company so far. Sector average: 0%.n = 305

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.
You don't need a GmbH or Ltd for this procedure — sole traders and freelancers may bid (Art. 19 Dir. 2014/24/EU). Eligibility counts, not legal form. More in the guide →

Foreign bidders

In Poland · Construction work, 139 contracts went to foreign companies over the last 3 years (of 193,358 recorded awards) — mostly from Germany, Spain, France.

Typical field: median 5 (from 4,943 awards).

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

What the buyer is looking for

The subject of the contract is the comprehensive execution of construction works together with accompanying and temporary works, consisting in the construction of a bicycle sports zone in the Suble Park in Tychy as part of the Citizens' Budget. The main subject is land development for the creation of dirt park bicycle routes consisting of three tracks with different levels of difficulty created thanks to the appropriate terrain. The scope of the contract includes, among others: a) construction of a ground runway common to 3 routes, b) construction of 3 routes consisting of a hill, muld, REZI, c) assembly of a bicycle pitstop, d) assembly of elements of small architecture: benches, baskets, bike racks, e) assembly of the regulation board, f) making plantings. A detailed description of the subject of the contract is attached as Annex 4 to the FTZ. CHANGES TO THE CONTRACT CONTINUOUS…

Show full description

… AGREEMENT • § 15 sec. 1-4 PPU 1. The Ordering Party allows the possibility of changing the date of performance of the subject of the contract specified in § 4 only in the following cases: a) in the event of force majeure, i.e. a random external event, the consequences of which cannot be predicted (e.g. intense excessive weather conditions, e.g. rain, snow, hail, hurricane, air temperature, as well as strike, war, epidemic), and if necessary to take measures to limit the effects of force majeure. Force majeure is also considered to be the effects of events causing it, b) the occurrence within the term of the contract of weather conditions preventing or significantly hindering the proper implementation of works in accordance with the law, adopted standards, indications of manufacturers of materials and equipment, technological process (e.g. inadequate air humidity, inadequate ground temperature relative to the dew point, temperature preventing the binding of concrete, synthetic coatings, earthworks); The Contractor is obliged to notify the Contracting Authority by e-mail about the impossibility of performing works due to the circumstances indicated in points (a) and (b), no later than on the second day after the event, (c) extraordinary economic events independent of the parties, e.g. caused by the state of emergency, embargo, epidemic, state of natural disaster, and resulting in the lack or significant impediment to access to materials or equipment necessary to perform the subject of the contract, (d) in the event of a change in generally applicable law to the extent affecting the date of performance of the subject of the contract, (e) activities of public administration authorities, in particular maintenance or construction supervision services, fire protection services, sanitary services, having a direct or indirect impact on the date of performance of works, in particular suspension of construction, the need to perform archaeological works (archaeological research), changes in the design documentation and related construction works, (f) delay, not attributable by the Contractor in obtaining from the relevant institutions and bodies or third parties the necessary arrangements, permits, decisions, etc., within the instructional or mandatory time limits resulting from the applicable provisions of law, as well as within the time limits adequate to obtain them, when these time limits do not result from the provisions of law, (g) in the event of circumstances not attributable to and independent of the Contractor and resulting in an extended procedure for obtaining consents, permits and certificates enabling the facility to be handed over for use, (h) in the event of commissioning additional works pursuant to Article 455 of the PPL or other works necessary for the proper performance of the basic contract, and) if the project documentation on the basis of which the subject of the contract is implemented contains errors, deficiencies or defects or has been amended for other reasons such as improving the functionality of the facility, (j) in the event of a significant extension of the course of the public procurement procedure, including the extension of the appeal procedure before the National Board of Appeal, provided that the extension

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

BuyerGmina Miasta Tychy
TypeWorks
Estimated valuenot published — common for below-threshold procedures
Published24 September 2026
CategoryConstruction work · CPV 45000000-7

Who has won here before

CompanyAwardsPeriod
Wybrańczyk Józef ZPHU REMSTOL252021–2026
Elmax Żywicki Sp. z o.o.142021–2026
BERYLBOLA BORKIEWICZ WIOLETA132022–2026
BEN-BUD Sp. z o.o.72022–2026
Przychodnia weterynaryjna EURO-WET s.c. Anna i Łukasz Zarębscy62022–2024
From 18.0M documented awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this

202133
202251
202333
202431
202539
202635

Who knows the rhythm prepares instead of reacting.

·
days until the deadline — Tuesday 13 October at 09:00

How to bid

Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.

Read the full notice — Original + documents
Goes directly to this tender on eZamówienia. The full specification and all annexes are there.
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now →