Reconstruction of the main switchboard of the kitchen building
Przebudowa rozdzielnicy głównej budynku kuchni
Poland · Leszno · how to bid here →
Your path to submission
- Deadline: 5 October at 09:30 — 2 days left.
- You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 7 months (6 awards, most recently November 2025) — by that rhythm the next award was due around June 2026. The last award went to Firma Handlowo-Usługowa ENERGOTECH Krzysztof Palica.n = 6
- 51% of this buyer's awards went to companies that had already won here before (1,095 awards since 2021, spread over 519 companies). That is well above the sector norm (28%) — newcomers have a harder time here than elsewhere.n = 1,095 awards since 2021
- 41% of the bids received came from small and medium-sized enterprises (149 procedures with a bid mix). Sector: 72%.n = 149
- The median procedure drew 3 bids (478 procedures with a bid count); 28% ended with a single bidder. Sector: median 3 bids.n = 478
- < 1% of the bids received came from other countries (149 procedures with a bid mix) — all bidders, not just the winners. Sector: 4%.n = 149
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 30/09/2026.
Foreign bidders
In Poland · Electrical machinery, 88 contracts went to foreign companies over the last 3 years (of 8,207 recorded awards) — mostly from Germany, France, Italy.
Typical field: median 3 (from 1,413 awards).
What the buyer is looking for
The subject of the contract is delivery along with a comprehensive reconstruction of the low voltage main switchgear RG of the Kitchen Building, including the execution of design documentation, delivery and installation of a new switchgear, execution of temporary power supply, switching of existing circuits and carrying out the required measurements, tests and acceptances as part of the task entitled: Reconstruction of the main switchboard of the building – in accordance with the conditions, detailed description and quantity set out in Annex No 23.3. to the FTZ ‘Detailed description of the subject-matter of the contract’.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Medtronic Poland Sp. z o.o. | 20 | 2022–2026 |
| SKAMEX SPÓŁKA AKCYJNA | 18 | 2022–2026 |
| ZARYS INTERNATIONAL SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ (ZARYS ZABRZE) | 17 | 2022–2026 |
| Meden-Inmed sp. z o. o. | 15 | 2022–2026 |
| Urtica Sp. z o. o. | 13 | 2022–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.