Modernization of the electrical power supply system in the Hospital buildings
Modernizacja systemu zasilania elektrycznego w budynkach Szpitala
Poland · Kalisz · how to bid here →
Your path to submission
- Deadline: 9 October at 09:00 — 5 days left.
- You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 3 months (17 awards, most recently May 2026) — by that rhythm the next award was due around August 2026. The last award went to WOJCIECH PRZEPIÓRKA ZAKŁAD REMONTOWOBUDOWLANY "MAXBUD".n = 17
- 30% of the bids received came from small and medium-sized enterprises (590 procedures with a bid mix). Sector: 84%.n = 590
- 62% of this buyer's awards went to companies that had already won here before (1,200 awards since 2021, spread over 434 companies). That is well above the sector norm (44%) — newcomers have a harder time here than elsewhere.n = 1,200 awards since 2021
- The median procedure drew 4 bids (636 procedures with a bid count); 19% ended with a single bidder. Sector: median 5 bids.n = 636
- 6% of awards went to companies from abroad (1,200 awards with a known winner country). Sector average: 0%.n = 1,200
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 30/09/2026.
Foreign bidders
In Poland · Construction work, 138 contracts went to foreign companies over the last 3 years (of 192,928 recorded awards) — mostly from Germany, Spain, France.
Typical field: median 5 (from 4,943 awards).
What the buyer is looking for
1 The subject of the contract is the modernization of the electrical power supply in the Hospital at ul. Poznańska 79 – Stage I . 2 The first stage of the modernization of the electric power supply includes only the modernization of low voltage main switchgear in segments C and D of the main building of the Hospital and in the technical and economic building (in accordance with the provisions contained in the Designer's Annex No 3 to the Implementing Project, Revision B attached to the SWZ), i.e.: non-reservable switchgear RNN-N-C (Fig. E-6, E-20), switchgear RNN-R-C with switchgear RNN-R-RR (Fig. E-11, E-14, E-17, E-25), switchgear non-reservable RNN-N-D (Fig. E-7, E-21), RNN-R-D reserve switchgear (Fig. E-12, E-26), switchgear of non-reservable RNN-N-BT technical and economic building (Fig. E-8, E-22), switchgear RNN-R-BT of a technical and economic building (Fig. E-13,…
Show full description
… E-27), RNN-RA aggregator switchgear (Fig. E-15), together with the necessary accompanying works (disassembly, racking, cabling, signalling, renovation of premises) within the scope specified in the Executive Project for segments C and D of the main and technical-economic building and aggregator.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Urtica Sp. z o.o. | 35 | 2024–2026 |
| Aesculap Chifa Sp. z o.o. | 34 | 2021–2026 |
| SALUS INTERNATIONAL SP. Z O.O. | 29 | 2024–2026 |
| Farmacol-Logistyka Sp. z o.o. | 27 | 2024–2026 |
| Aesculap Chifa Sp. z o.o. · 64-300 PL | 20 | 2024–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.