Friedrich & ClementBETA

Sanatorium Renovation

Remont Sanitariatów

Poland · Warszawa · how to bid here →

Your path to submission

  1. Deadline: 8 October at 10:00 — 4 days left.
  2. You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
  3. Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

Clement What the numbers say about this buyer

  • In this sector the buyer awards roughly every 3 months (27 awards, most recently July 2026) — by that rhythm the next award was due around September 2026. The last award went to FINETECH CONSTRUCTION SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ.n = 27
  • 20% of this buyer's awards went to companies that had already won here before (1,173 awards since 2017, spread over 603 companies). That is well below the sector norm (44%) — this buyer switches suppliers more often than others.n = 1,173 awards since 2017
  • The award came in at a median 39% of the estimated value (44 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 83%.n = 44
  • The median procedure drew 3 bids (552 procedures with a bid count); 26% ended with a single bidder. Sector: median 5 bids.n = 552
  • 5% of awards went to companies from abroad (1,173 awards with a known winner country). Sector average: 0%.n = 1,173

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.
The Russia sanctions declaration (Art. 5k) comes with nearly every procedure — a formality, but missing it means exclusion.

Foreign bidders

In Poland · Construction work, 138 contracts went to foreign companies over the last 3 years (of 193,303 recorded awards) — mostly from Germany, Spain, France.

Typical field: median 5 (from 4,943 awards).

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

What the buyer is looking for

1. Activity 1 – Renovation of 2 sanitary facilities; 1. A detailed description of the subject of the contract is attached as Annex 3A to the FTZ and Chapter III. XIX SWZ. 2. The Contractor shall grant: 1) warranty for construction works for a period of 60 months; 2) guarantees for construction works for a period of at least 60 months (in accordance with the Contractor's offer); 3) guarantees for installed devices for a period of at least 36 months - (but not shorter than the manufacturer's guarantee - in accordance with the Contractor's offer), counting from the date of signing the protocol of final acceptance of the works. 3. The Contracting Authority allows the subcontractor to be entrusted with the performance of part of the contract. 4. The Contracting Authority requests the Contractor to indicate in the tender the parts of the contract which it will entrust to Subcontractors and to…

Show full description

… indicate the names of any Subcontractors, if they are already known. 2. Task 2 – Renovation of sanitation 1. A detailed description of the subject of the contract is attached as Annex 3B to the FTZ and Chapter II. XIXa SWZ . 2. The Contractor shall grant: 1) warranty for construction works for a period of 60 months; 2) guarantees for construction works for a period of at least 60 months (in accordance with the Contractor's offer); 3) guarantees for installed devices for a period of at least 36 months - (but not shorter than the manufacturer's guarantee - in accordance with the Contractor's offer), counting from the date of signing the protocol of final acceptance of the works. 3. The Contracting Authority allows the subcontractor to be entrusted with the performance of part of the contract. 4. The Contracting Authority requests the Contractor to indicate in the tender the parts of the contract which it will entrust to Subcontractors and to indicate the names of any Subcontractors, if they are already known.

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

BuyerKOMENDA STOŁECZNA POLICJI
TypeWorks
Estimated valuenot published — common for below-threshold procedures
Published23 September 2026
CategoryConstruction work · CPV 45453000-7

Who has won here before

CompanyAwardsPeriod
Satoria Group Spółka Akcyjna202024–2026
Rembud Kazimierz Jasiński82024–2026
WiMaKS Sławomir Skwara82021–2026
Przedsiębiorstwo Handlowe "SEA" Paweł Bronikowski82021–2026
TAS Tomasz Orlikowski82022–2026
From 18.0M documented awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this

202113
202211
20232
20246
202513
20263

Who knows the rhythm prepares instead of reacting.

·
days until the deadline — Thursday 8 October at 10:00

How to bid

Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.

Read the full notice — Original + documents
Goes directly to this tender on eZamówienia. The full specification and all annexes are there.
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now →