Thermal Modernization of the Municipal Public Library in Wiązów
Termomodernizacja Gminnej Biblioteki Publicznej w Wiązowie
Poland · Wiązów · how to bid here →
Your path to submission
- Deadline: 7 October at 09:00 — 1 day left.
- You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 3 months (26 awards, most recently July 2026) — the next award is due around October 2026 by that rhythm. The last award went to Firma Handlowa EURO-STANDARD Antoni Król Andrzej Król.n = 26
- The median procedure drew 3 bids (8 procedures with a bid count); 0% ended with a single bidder. Sector: median 5 bids.n = 8
- 40% of this buyer's awards went to companies that had already won here before (59 awards since 2021, spread over 35 companies). 60% went to new names.n = 59 awards since 2021
- 2% of awards went to companies from abroad (59 awards with a known winner country). Sector average: 0%.n = 59
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Poland · Construction work, 139 contracts went to foreign companies over the last 3 years (of 193,366 recorded awards) — mostly from Germany, Spain, France.
Typical field: median 5 (from 4,957 awards).
What the buyer is looking for
The scope of work includes, among others: THERMOMODERNIZATION WORKS: I. Insulation of external partitions: 1. External walls: • External wall insulation surface: 948,8m2 insulation material: Styrofoam - thickness: 0,18m. Heat transfer coefficient (U) of the partition after insulation: 0.152W/(m2K). In addition, new window sills, window winders, sheet metal processing including new guttering, reconstruction or execution of a new lightning protection system, thermal insulation, humidity insulation and band drainage of foundation walls (renovation of bands around buildings) will be made. • Insulation surface of external walls according to fire extinguishing: 61.5m2 insulation material: mineral wool - thickness: 0,18 m. Heat transfer coefficient (U) of the partition after insulation: 0.164W/(m2K). In addition, new window sills, window winders, sheet metal processing including new guttering,…
Show full description
… reconstruction or execution of a new lightning protection system, thermal insulation, humidity insulation and band drainage of foundation walls (renovation of bands around buildings) will be made. • Surface insulation of the exterior walls of the front façade according to the guidelines of the conservator: 239m2, insulation material: heat-resistant plaster thickness: It's four centimeters. Heat transfer coefficient (U) of the partition after insulation: 0,694W/ (m2K). In addition, new window sills, window ventilators, sheet metal processing including new guttering, reconstruction of lightning protection system, performance of thermal and humidity insulation and band drainage of foundation walls (renovation of bands around buildings) will be made. 2. Ceilings: • Insulation surface of the ceiling under the unheated attic: 156.7m2, insulation material: mineral wool - thickness: It's 0.20m. Heat transfer coefficient (U) of the partition after insulation: 0.133 W/(m2K). In addition, floors/floors will be made. • Insulation area of the ventilated roof: 326,0m2, insulation material: granulated wool thickness: 0,19m. Heat transfer coefficient (U) of the partition after insulation: 0.144 W/(m2K). In addition, a new roof covering in the form of a papa, reconstruction of the lightning protection system, new guttering will be made. • External ceiling insulation area - passage: 59,4m2, insulation material: mineral wool thickness: 0.22m. Heat transfer coefficient (U) of the partition after insulation: 0.144 W/(m2K). II. Replacement of joinery: 1. It was designed to replace the old wooden joinery with new five-chamber PVC windows with a heat transfer coefficient of Uw=0.9 W/m2K. Carpentry replacement area: 10,92 m2 (2 pcs.) In addition, additional works will be carried out, including: new interior and exterior window sills, installation of blinds and stained glass, installation of diffusers controlled automatically on all windows. • The replacement of PVC joinery with new five-chamber PVC windows with automatically controlled ventilators with a heat transfer coefficient Uw=0.9 W/m2K has been designed. Carpentry replacement area: 171.0m2 (84 pcs.) In addition, additional works will be carried out, including: new internal and external window sills, installation of diffusers controlled automatically on all windows. 2. Door joinery: It was designed to replace the old door joinery with a new door with a heat transfer coefficient Ud=1.3 W/m2K. Carpentry replacement area: 33.1m2 – 9 pieces In addition, the required demolition works will be carried out. III. Modernization of the central heating system (heating system) The installation of a new RES-type heat source has been designed, i.e.: a pellet boiler with a power of not less than 73kW with the replacement of a c.o. installation of valves under vertical and thermostatic on all radiators together with a buffer tank and weather automation, as well as the necessary accompanying and restoration works after the installation has been modernized. IV. Repair of bands around buildings and approaches to the building - band with a width of 50 cm made of granite grit 15cm on non-woven fabric with additional protection from the concrete edge 8/30/100cm. Locally, the band is a project
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Przedsiębiorstwo Handlowo – Usługowe „ZURB” S.C. Andrzej Żurek, Elżbieta Żurek | 6 | 2021–2022 |
| ASB Budownictwo Sebastian Augustyn | 5 | 2021–2026 |
| PHU Komunalnik Sp. z o.o. | 5 | 2021–2025 |
| Mar-Travel Szydziak Mariusz | 4 | 2022–2026 |
| Przedsiębiorstwo Robót Drogowo-Mostowych Sp. z o.o. | 3 | 2023–2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.