Construction and modernization of pedestrian crossings in county road networks
Budowa i modernizacja przejść dla pieszych w ciągach dróg powiatowych
Poland · Wałbrzych · how to bid here →
Your path to submission
- Deadline: 9 October at 09:00 — 3 days left.
- You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (64 awards, most recently July 2026) — by that rhythm the next award was due around September 2026. The last award went to Przedsiębiorstwo Robót Inżynieryjnych ONMAX GROUP Sp. z o.o..n = 64
- The median procedure drew 2 bids (13 procedures with a bid count); 15% ended with a single bidder. Sector: median 5 bids.n = 13
- 42% of this buyer's awards went to companies that had already won here before (140 awards since 2015, spread over 80 companies). 58% went to new names.n = 140 awards since 2015
- Not one of the 140 awards with a known winner country has gone to a foreign company so far. Sector average: 0%.n = 140
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Poland · Construction work, 139 contracts went to foreign companies over the last 3 years (of 193,366 recorded awards) — mostly from Germany, Spain, France.
Typical field: median 5 (from 4,957 awards).
What the buyer is looking for
The contract includes the execution of works consisting in the construction of pedestrian crossings with lighting within the indicated locations: 1) ul. Bystrzycka in Dziećmorowice, at real estate no. 47, 2) ul. Żeromski in Boguszów-Gorce, at the intersection with ul. Gen. Józefa Bema, 3) ul. Main in Stare Bogaczowice, at property no. 174, 4) ul. The station in Mieroszów, at the intersection with Al. Armii Krajowej, 5) intersection at real estate no. 77 in Witków. The description of the subject of the contract results from the design documentation and technical specifications for the execution and acceptance of the works. The bill of quantities is merely a supporting document. These documents are attached as Annex 1 to the FTZ.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Przedsiębiorstwo Usługowo-Produkcyjne i Handlowe COM-D Sp. z o.o. | 10 | 2021–2026 |
| Świdnickie Przedsiębiorstwo Budowy Dróg i Mostów Sp. z o.o. | 6 | 2022–2026 |
| Przedsiębiorstwo Usługowo-Handlowo-Produkcyjne Transport drogowy Roman Szewczuk | 6 | 2022–2026 |
| ORLEN Spółka Akcyjna | 6 | 2021–2026 |
| REMAR S.C. Ryszard Kotuła, Maria Kotuła | 5 | 2023–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.