Supervision of investment in the sanitary sector for the purposes of implementing the task entitled "Tyski HUB of green economy"
Pełnienie nadzoru inwestorskiego w branży sanitarnej dla potrzeb realizacji zadania pn. „Tyski HUB zielonej gospodarki”
Poland · Tychy · how to bid here →
Your path to submission
- Deadline: 7 October at 09:00 — 1 day left.
- You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 5 months (13 awards, most recently May 2026) — the next award is due around October 2026 by that rhythm. The last award went to PROGEO KATOWICE M. ROGALA-SZCZEPAŃSKA, M. NOWAK spółka jawna.n = 13
- 45% of this buyer's awards went to companies that had already won here before (305 awards since 2021, spread over 168 companies). 55% went to new names.n = 305 awards since 2021
- Not one of the 305 awards with a known winner country has gone to a foreign company so far. Sector average: 1%.n = 305
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Poland · Architecture & engineering, 112 contracts went to foreign companies over the last 3 years (of 40,054 recorded awards) — mostly from Germany, France, Switzerland.
Typical field: median 4 (from 4,644 awards).
What the buyer is looking for
The subject of the contract is the provision of a service to the contracting authority consisting in performing the function of investor supervision inspector in the sanitary industry during the implementation of the investment entitled: ‘Tyski HUB Green Economy’. A detailed description of the subject-matter of the contract is contained in Annex 4 to the FTZ. The deadline for performance of the contract - from the date of conclusion of the contract to 30.03.2028. The deadline set by the date results from the period of performance of the contract concluded for the execution of construction works for the task entitled: ‘Tyski HUB Green Economy’. 1. Where trademarks, patents or the origin, source or specific process that characterises the products or services provided by a particular economic operator is indicated in the documentation, the contracting authority shall allow the use of…
Show full description
… equivalent materials as described. 2. Where reference is made in the description of the subject-matter of the contract to standards, technical assessments, technical specifications and technical reference systems referred to in Art. 1 point 2 and paragraph. 3 of the PPL Act, the contracting authority allows solutions equivalent to those described. 3. Where trade marks, patents, the manufacturer or the specific origin of the product are indicated in the procurement documents, these headings must be presumed to contain the words ‘or equivalent’. 4. The contractor who relies on equivalent solutions is obliged to demonstrate that the solution offered by him meets the requirements specified by the contracting authority. In this case, the contractor shall attach to the tender documents confirming the equivalence of the solutions offered. The burden of proving equivalence lies with the economic operator. The Contractor shall demonstrate equivalence by any (reliable) means. Failure to demonstrate equivalence results in the rejection of the tender as non-compliant with the terms of the contract. Continuation from SECTION IX - OTHER INFORMATION _ DESIGNED PROVISIONS OF THE AGREEMENT: 9. When submitting an application for adjustment of remuneration for the reasons specified in para. 1 point 2), 3), 4) The Contractor is obliged to document in particular: 1) Number of employees performing the subject of the contract on the construction site whose remuneration for work on the date of entry into force of the regulations on the change of the minimum wage was lower than the amount of the minimum wage under the new regulations, 2) The total value of the necessary increase in remuneration for all employees referred to in point. 1) up to the new minimum wage level, 3) Employment contracts of employees employed by the contractor in the performance of the contract with a minimum wage or minimum hourly rate in the two months preceding the entry into force of the new regulations together with payroll and accounting documentation reflecting the cost of remuneration of these persons borne by the contractor. The above also applies to employees with a salary higher than the previously provided minimum wage, but not higher than the currently provided minimum wage, 4) Employment contracts of employees employed by the contractor in the performance of the contract with a minimum wage or a minimum hourly rate within a month after the entry into force of the new rates, together with payroll and accounting documentation reflecting the increased cost of remuneration for these people borne by the contractor. This also applies to employees with a salary higher than the previously provided minimum wage, but not higher than the currently provided minimum wage. 10. Pursuant to Article 439 para. 1 of the Act, the Parties provide for a change in the amount of remuneration due to the Contractor in the event of a change in the price index and consumer services. By changing the price and consumer services index is meant its increase and decrease. Salary can be increased as well as decreased. 11. If the change in the index of prices and consumer services referred to in paragraph. 12, relative to the index of prices and consumer services in force in the month in which the offer was made, will change by at least 5%, each Party entitled
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Wybrańczyk Józef ZPHU REMSTOL | 25 | 2021–2026 |
| Elmax Żywicki Sp. z o.o. | 14 | 2021–2026 |
| BERYLBOLA BORKIEWICZ WIOLETA | 13 | 2022–2026 |
| BEN-BUD Sp. z o.o. | 7 | 2022–2026 |
| Przychodnia weterynaryjna EURO-WET s.c. Anna i Łukasz Zarębscy | 6 | 2022–2024 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.