Modernization of water reservoirs to restore their retention capacity together with the development of adjacent spaces in Bejsce Municipality, i.e. in the villages of: Królewice, Uściszowice and Kijany
Modernizacja zbiorników wodnych w celu przywrócenia ich retencji wraz z zagospodarowaniem przestrzeni przyległych na terenie Gminy Bejsce tj. w msc.: Królewice, Uściszowice i Kijany
Poland · Bejsce · how to bid here →
Your path to submission
- Deadline: 7 October at 09:00 — 1 day left.
- You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 5 months (22 awards, most recently July 2026) — the next award is due around December 2026 by that rhythm. The last award went to Elkamen sp. z o.o. sp. komandytowa.n = 22
- 28% of this buyer's awards went to companies that had already won here before (37 awards since 2021, spread over 26 companies). That is well below the sector norm (44%) — this buyer switches suppliers more often than others.n = 37 awards since 2021
- Not one of the 37 awards with a known winner country has gone to a foreign company so far. Sector average: 0%.n = 37
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Poland · Construction work, 139 contracts went to foreign companies over the last 3 years (of 193,366 recorded awards) — mostly from Germany, Spain, France.
Typical field: median 5 (from 4,957 awards).
What the buyer is looking for
1. The subject of the contract is the performance of a contract in the ‘design and build’ formula for the implementation of the task entitled ‘Modernisation of water reservoirs in order to restore their retention together with the development of adjacent spaces in the Municipality of Bejsce, i.e. in the municipality of: Königsberg, Usciszowice and Kyiv’. The scope of the contract includes: Design work (A). The subject of the contract is the preparation of design documentation for the development of a construction project together with obtaining the necessary arrangements and decisions enabling the construction process to be carried out and, on their basis, the execution of construction works for the task in accordance with the applicable law. The project documentation is to be complete in order to obtain the necessary decisions that will enable the commencement of construction works…
Show full description
… under the investment in question. The Contracting Authority shall grant the Contractor all necessary powers of attorney to obtain, in particular, a building permit/notification. Scope of works (B). The contractor will perform the works in accordance with the development, design and implementation documentation accepted by the engineer and the Ordering Party. The construction works consist of: Preparatory work: development of the construction site, including: - construction facilities, - provision of utilities necessary for the needs of construction, - temporary fences, - access roads to facilities, - fire protection and health and safety equipment, - full geodetic service at the design stage, execution of works and as-built inventory with bringing to the state geodetic resource, - removal of existing trees, grubbing up trees and shrubs and remaining greenery (management of harvested wood to be agreed with the Investor) - earthworks to be carried out mechanically and manually, - removal of the humus layer, - demolition works, demolition of pond dykes, demolition of road slabs, - earthworks (embankments, excavations), - transport of land to embankments, incorporation of land into the embankment, - density of embankments to the extent consistent with the documentation, - humusing: embankment slopes, trench slopes, road lane terrain, Technological works: - silencing of the pond to the average depth indicated in the PZT together with the removal of the excavated material for a distance of up to 1 km, the Contracting Authority permits the development of the obtained excavated material on the investment site after checking the suitability for the above-mentioned purposes, - construction of fortification of the pond edges (stone overlay) - construction of fortification of the inner edges of the pond with a slope of 1:1,5-2 along with sowing a mixture of grasses, - construction of new monks and drainage devices, valves, diameters and parameters to be selected on the basis of calculations, - silencing of the groove, technical parameters to be selected on the basis of calculations (width, slope slope, depth), - construction of outlets from ponds, diameters to be selected on the basis of calculations and required arrangements, - construction of paved exits, - installation of small architecture elements, - construction of 2.00-3.00m wide pond dikes slope 1:1,5 - 1:3 (material delivered or local after the Inspector's approval), - felling and grubbing up trees, bushes on investment plots, scope at the project stage to be agreed with the Investor.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Zakład Usługowo Remontowy Marek Górniak, | 4 | 2024–2026 |
| Zakład Usług Wielobranżowych HYDROSVAT | 3 | 2021–2025 |
| Zakład Usługowo - Remontowy Marek Górniak | 2 | 2022–2024 |
| Przedsiebiorstwo Budowlane POLBUD Tomasz Darowski | 2 | 2025 |
| ELEKTRO&SOLAR Sp. z o.o., | 2 | 2023 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.