Construction and development of 5 pocket squares and 7 green bus stops located in Gorzów Wielkopolski
Budowa i zagospodarowanie 5 skwerów kieszonkowych oraz 7 zielonych przystanków zlokalizowanych na terenie Gorzowa Wielkopolskiego
Poland · Gorzów Wielkopolski · how to bid here →
Your path to submission
- Deadline: 9 October at 10:00 — 4 days left.
- You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every month (155 awards, most recently August 2026) — by that rhythm the next award was due around September 2026. The last award went to Usługi Sprzętowo - Transportowe Karol Wiącek.n = 155
- The median procedure drew 2 bids (34 procedures with a bid count); 47% ended with a single bidder. Sector: median 5 bids.n = 34
- 43% of this buyer's awards went to companies that had already won here before (416 awards since 2015, spread over 211 companies). 57% went to new names.n = 416 awards since 2015
- 1% of awards went to companies from abroad (416 awards with a known winner country). Sector average: 0%.n = 416
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Poland · Construction work, 139 contracts went to foreign companies over the last 3 years (of 193,358 recorded awards) — mostly from Germany, Spain, France.
Typical field: median 5 (from 4,943 awards).
What the buyer is looking for
1. The subject of the contract are construction works and greenery industry consisting in the development of the square at ul. Woskowa/ ul. Industrial through the construction of a pocket square in accordance with the design documentation. Detailed information can be found in Part II-Description of the subject-matter of the contract – OPZ. The scope of work to be carried out and the technology of the work shall be determined in particular by: a) Design documentation, b) Technical Specifications for the Performance and Acceptance of Works, c) Billing Elements Table, d) Draft Contract Documents describing the subject of the contract should be treated as mutually explanatory and complementary in the sense that if any ambiguity or ambiguity of performance is found, the Contractor will not be able to limit the scope of his obligation or the scope of due diligence. If the names of materials…
Show full description
… and adopted technology appear in the Description of the Subject of the Order, in the Design Documentation and in the Technical Specifications for the Execution and Acceptance of Construction Works, they should be understood as specifying the required technical parameters or quality standards. This means that the Ordering Party allows the submission of offers equivalent to the materials and equipment used, while maintaining their quality requirements. Information about the terms and conditions of the Warranty and Guarantee can be found in the OPZ. 2. The subject of the contract are construction works and greenery industry consisting in the development of the square at ul. Hejmanowska and ul. Matejki/ ul. Kosynierów Gdyniańskie by building two pocket squares in accordance with the design documentation. Detailed information can be found in Part II-Description of the subject-matter of the contract – OPZ. The scope of work to be carried out and the technology of the work shall be determined in particular by: a) Design documentation, b) Technical Specifications for the Performance and Acceptance of Works, c) Billing Elements Table, d) Draft Contract Documents describing the subject of the contract should be treated as mutually explanatory and complementary in the sense that if any ambiguity or ambiguity of performance is found, the Contractor will not be able to limit the scope of his obligation or the scope of due diligence. If the names of materials and adopted technology appear in the Description of the Subject of the Order, in the Design Documentation and in the Technical Specifications for the Execution and Acceptance of Construction Works, they should be understood as specifying the required technical parameters or quality standards. This means that the Ordering Party allows the submission of offers equivalent to the materials and equipment used, while maintaining their quality requirements. Information about the terms and conditions of the Warranty and Guarantee can be found in the OPZ. 3. The subject of the contract are construction works and greenery industry consisting in the development of the square at ul. Piłsudskiego/ ul. Walczaka and ul. Freight and 7 green public transport stops through the construction of two pocket squares and 7 green stops in accordance with the design documentation. Detailed information can be found in Part II-Description of the subject-matter of the contract – OPZ. The scope of work to be carried out and the technology of the work shall be determined in particular by: a) Design documentation, b) Technical Specifications for the Performance and Acceptance of Works, c) Billing Elements Table, d) Draft Contract Documents describing the subject of the contract should be treated as mutually explanatory and complementary in the sense that if any ambiguity or ambiguity of performance is found, the Contractor will not be able to limit the scope of his obligation or the scope of due diligence. If the names of materials and adopted technology appear in the Description of the Subject of the Order, in the Design Documentation and in the Technical Specifications for the Execution and Acceptance of Construction Works, they should be understood as specifying the required technical parameters or quality standards. This means that the Ordering Party allows the submission of offers equivalent to the materials and equipment used, with
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Usługi Sprzętowo - Transportowe K. Wiącek | 14 | 2021–2026 |
| Prywatne Przedsiębiorstwo Usługowo-Drogowe „DROGUS” Krzysztof Wiącek | 13 | 2021–2026 |
| F.P.H.U. CHEĆKO Jacek Chećko | 13 | 2022–2025 |
| Zakład Projektowania i Usług Komunalnych „PORAJ” | 10 | 2021–2025 |
| INNEKO RCS sp. z o.o. | 10 | 2021–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.