Modernization of Średz District Railway infrastructure and replacement of railway sleepers
Modernizacja infrastruktury Średzkiej Kolei Powiatowej i wymiana podkładów kolejowych
Poland · Środa Wielkopolska · how to bid here →
Your path to submission
- Deadline: 7 October at 09:00 — 1 day left.
- You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (62 awards, most recently July 2026) — by that rhythm the next award was due around September 2026. The last award went to Lider Usług Komunalno-Samorządowych Sp. z o.o..n = 62
- 66% of this buyer's awards went to companies that had already won here before (99 awards since 2021, spread over 34 companies). That is well above the sector norm (44%) — newcomers have a harder time here than elsewhere.n = 99 awards since 2021
- Not one of the 99 awards with a known winner country has gone to a foreign company so far. Sector average: 0%.n = 99
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Poland · Construction work, 139 contracts went to foreign companies over the last 3 years (of 193,366 recorded awards) — mostly from Germany, Spain, France.
Typical field: median 5 (from 4,957 awards).
What the buyer is looking for
The subject of the contract is the execution of works on the track infrastructure, which will improve the geometrical parameters of the track and increase the safety of the runs on the following sections: - arch within the stop Wednesday Narrow. (Wednesday M – Wednesday Wąs.k) km 46, 106 – 46, 256 - Śnieciska – Polwica Trail (Fine-rail Charity km 56.559 – 57.063 and Thick-rail Charity km 57.063 – 57.249), - Polwica – Zaniemyśl Trail km 58.125 – 58.345. The scope of work includes, among others: - disassembly and installation of track surface; - replacement of wooden sleepers, screws, bolts with a nut and a ring, - supplementing the ballast, - profiling the track, - carrying out maintenance works consisting in maintaining the trench on both sides of the track in a proper state, - raising the track and adjustment in the plan and profile, - profiling the ballast, - additional activities, including lubrication of the head chambers, disposal of used sleepers.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Powiatowe Centrum Inwestycji Sp. z o.o. | 23 | 2021–2026 |
| Firma Ro0bót Drogowych Krzysztof Kukulski | 8 | 2021–2024 |
| Firma Budowlano-Usługowa EKO-BUD s.c. Elżbieta, Jacek Majdeccy Lisewo 2B 62-310 Pyzdry | 7 | 2022–2026 |
| Lider Usług Komunalno-Samorządowych Sp. z o.o. - Lider Konsorcjum | 6 | 2021–2026 |
| KOST-BUD PIOTR DRUCHLIŃSKI | 6 | 2024–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.