Expansion of sanitary sewerage in Andrespol municipality
Rozbudowa kanalizacji sanitarnej na terenie gminy Andrespol
Poland · Andrespol · how to bid here →
Your path to submission
- Deadline: 8 October at 11:00 — 4 days left.
- You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (73 awards, most recently June 2026) — by that rhythm the next award was due around August 2026. The last award went to STRADA Łukasz Piątek.n = 73
- 24% of this buyer's awards went to companies that had already won here before (139 awards since 2015, spread over 100 companies). That is well below the sector norm (44%) — this buyer switches suppliers more often than others.n = 139 awards since 2015
- The median procedure drew 4 bids (10 procedures with a bid count); 10% ended with a single bidder. Sector: median 5 bids.n = 10
- Across 3 procedures with structured selection criteria, this buyer most often required: Equipment, plant and technical facilities (2 of 3), Staff qualifications (2 of 3), References: services (1 of 3), References: works (1 of 3).n = 3
- 1% of awards went to companies from abroad (139 awards with a known winner country). Sector average: 0%.n = 139
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 27/09/2026.
Foreign bidders
In Poland · Construction work, 138 contracts went to foreign companies over the last 3 years (of 192,928 recorded awards) — mostly from Germany, Spain, France.
Typical field: median 5 (from 4,943 awards).
What the buyer is looking for
1. 4. Lot 1 – Construction of a sewage network in Okólna and Letniskowa Streets in Janówka 1) The subject of this contract is the execution of construction works consisting of: a. construction of a gravitational sanitary sewage network with sewage connections on the section from the canal to the property border and reconstruction of the street surface after the works carried out in Okólna Street in Janówka b. construction of a gravitational sanitary sewage network with sewage connections on the section from the canal to the property border and a discharge sewage network together with a sewage pumping station and reconstruction of the street surface after the works carried out in Letniskowa Street in Janówka 2) Detailed description of the subject of the contract, the scope of works and the technology of works and technical specifications for the execution and acceptance of construction…
Show full description
… works are set out in Annexes No 11 to No 13 inclusive: a. Annex No 11 – Detailed description of the subject-matter of the contract b. Annex No 12 – Design documentation, STWiORB c. Annex No 13 – Work measurements 3) Work measurements annexed to the FTZ contain a summary of the works envisaged in order to illustrate the scale of construction and to make it easier for Contractors to estimate the costs of implementing the investment. Measuring has an auxiliary function. 4) The Contractor is obliged to carry out in each of the streets a full range of material works involving the execution of sewage works along with the reconstruction of the surface in a manner consistent with the SOPZ. 5. The construction works must be carried out in accordance with the design documentation, the technical specifications for the execution and acceptance of the construction works, the applicable technical regulations, the rules of technical knowledge and under the conditions laid down in the contract. 6. The use of limestone or dolomite aggregate is not allowed when making foundation layers and sideways. 7. The Contractor undertakes to perform the subject of the contract in accordance with the principles of technical knowledge, applicable standards, regulations and norms. 8. All materials used to perform the subject of the contract must have appropriate attestations, certificates, technical approvals, declarations of conformity, current tests or other documents confirming their admission to trading and widespread use in construction and have the acceptance of the Ordering Party. 9. For the performance of the subject of the contract, construction products should be used in accordance with the law approved for general use in construction, marked with the CE mark or construction mark, or included in the list of products of minor importance for health and safety, in accordance with the Construction Products Act. 2. 4. Lot 2 – Construction of a sewage network in Polna Street in Justynów, Leśna Street in Janówka, Żuławska and Beskidzka Streets in Nowy Bedoń 1) The subject of this contract is the execution of construction works consisting in a. construction of a gravitational sanitary sewage network with sewage connections on the section from the canal to the border of the property and the pressure sewage network with a sewage pumping station, construction of rainwater sewage system and reconstruction of the road surface after the works carried out in Leśna Street in Janówka c. construction of a gravitational sewage system with sewage connections on the section from the canal to the border of the property and reconstruction of the street surface after the works carried out in Leśna Street in Janówka c. construction of a gravitational sewage system with sewage system connections on the section from the canal to the border of the property and reconstruction of the street surface after the works carried out in Żuwska and Bejdzkie Street Street in Nowy Bedodzkie Street, the scope of the technical specifications and specifications of the works included in Annex 2) are specified in the scope of the works and detailed description of the subject of the works, as well as well as well as follows: a. Annex No 14 – Detailed description of the subject-matter of the contract b. Annex No 15 – Design documentation, STWiORB d. Annex No 16 – Work measurements 3) Work measurements annexed to the FTZ contain a summary of the works envisaged for the purpose of illustrations
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| INSTYLE24 Sp. z o.o., | 5 | 2023–2024 |
| "STRADA" ADAM OLCZAK ŁUKASZ PIATEK SPÓŁKA CYWILNA | 5 | 2022–2024 |
| Usługi Handel Transport Anna Chmiel | 4 | 2022–2024 |
| STRADA Łukasz Piątek | 3 | 2025–2026 |
| ŻWIR-MAX FIRMA PRZEMYSŁAW SKUPIŃSKI | 3 | 2022–2024 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.