Repair works and reconstruction of heat source in residential building Leśniczówka Forester's Lodge
Roboty remontowe i przebudowa źródła ciepła w budynku mieszkalnym Leśniczówki Brzozówka
Poland · Spychowo · how to bid here →
Your path to submission
- Deadline: 7 October at 09:00 — 1 day left.
- You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (8 awards, most recently July 2025) — by that rhythm the next award was due around September 2025. The last award went to Usługi Ogólnobudowlane MAR-BUD Mysiorski Zenon.n = 8
- The median procedure drew just one bid (5 procedures with a bid count); 60% ended with a single bidder. Sector: median 5 bids.n = 5
- 24% of this buyer's awards went to companies that had already won here before (26 awards since 2021, spread over 16 companies). That is well below the sector norm (44%) — this buyer switches suppliers more often than others.n = 26 awards since 2021
- 8% of awards went to companies from abroad (26 awards with a known winner country). Sector average: 0%.n = 26
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Poland · Construction work, 139 contracts went to foreign companies over the last 3 years (of 193,366 recorded awards) — mostly from Germany, Spain, France.
Typical field: median 5 (from 4,957 awards).
What the buyer is looking for
1. Renovation works in the residential building Leśniczówka Brzozówka. The detailed scope of works includes: - drafting of works, - detailed technical specification of execution and acceptance of works, - design documentation, constituting annexes with numbers 8 - 13 to the FTZ. 2. Reconstruction of the heat source in the Leśniczówka Brzozówka residential building. As part of the reconstruction of the heat source, the traditional c.o. boiler for solid fuel (classless) will be replaced with a 5th class hybrid boiler, two heat buffers and weather automation will be installed. These measures will reduce heating costs and will have a positive impact on reducing pollutant emissions to the environment. The detailed scope of works includes: - drafting of works, - detailed technical specifications for the execution and acceptance of construction works, - design documentation, constituting annexes Nos 14 - 17 to the FTZ.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Przedsiębiorstwo Handlowo-Usługowe Czesław Zdunek | 4 | 2021–2024 |
| ŻUBR Zakład Usług Leśnych Trzcińscy Sp. J. | 3 | 2025 |
| Usługi Ogólnobudowlane "MAR-BUD" Zenon Mysiorski | 3 | 2022–2025 |
| Zkład Usług Leśnych Beata Skłodowska, Dariusz Kaczyński Spółka Jawna | 1 | 2022 |
| Zakład Usług Leśnych Beata Skłodowska, Dariusz Kaczyński Spółka Jawna | 1 | 2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.