Bielszowice Trails - Revitalization of cycling trails in Strzelnica Park
Bielszowice Trails - Rewitalizacja tras rowerowych w Parku Strzelnica
Poland · Ruda Śląska · how to bid here →
Your path to submission
- Deadline: 8 October at 09:30 — 4 days left.
- You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (171 awards, most recently July 2026) — by that rhythm the next award was due around September 2026. The last award went to REST Adam Marquardt.n = 171
- The median procedure drew 3 bids (124 procedures with a bid count); 23% ended with a single bidder. Sector: median 5 bids.n = 124
- 36% of this buyer's awards went to companies that had already won here before (660 awards since 2015, spread over 368 companies). 64% went to new names.n = 660 awards since 2015
- The award came in at a median 71% of the estimated value (22 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 83%.n = 22
- 98% of the bids received came from small and medium-sized enterprises (19 procedures with a bid mix). Sector: 84%.n = 19
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 30/09/2026.
Foreign bidders
In Poland · Construction work, 138 contracts went to foreign companies over the last 3 years (of 193,303 recorded awards) — mostly from Germany, Spain, France.
Typical field: median 5 (from 4 awards).
What the buyer is looking for
1. The scope of work to be carried out includes: The scope of the planned project is the execution of renovation works in accordance with the scope in the developed design documentation. 2. The subject of the contract includes the renovation of bicycle routes and other works provided for in the documentation and the drafting of works. 3. The facility is to meet the requirements of good practices and assumptions of sustainable cycling routes described in the publications: Trail Solutions – IMBA’s Guide to Building Sweet Singletracks, by Vernon Felton, Bike Parks IMBA’s Guide to New School Trails, by Bob Allen or equivalent. 4. A detailed description of the subject of the contract includes SWZ.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Piotr Bryła Biuro Wycen Nieruchomości OPERAT | 21 | 2021–2026 |
| ABM Wyceny Nieruchomości i Projektowanie Architektoniczne Bartosz Michalscy s.c. | 16 | 2021–2026 |
| BRUK S.J. Joachim Siwczyk | 14 | 2021–2026 |
| Zespół Geodetów Uprawnionych DE KA ER S.C. Stanisław Dornik | 14 | 2021–2024 |
| Beata Sroka Usługi Geodezyjne i Wycena Nieruchomości CAD-INWEST | 8 | 2021–2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.