Friedrich & ClementBETA

Performance of maintenance works on engineering structures (RDW in Chojno) divided into 3 tasks

Wykonanie robót utrzymaniowych na obiektach inżynierskich (RDW w Chojnie) z podziałem na 3 zadania

Poland · Koszalin · how to bid here →

Your path to submission

  1. Deadline: 8 October at 10:00 — 5 days left.
  2. You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
  3. Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

Clement What the numbers say about this buyer

  • In this sector the buyer awards roughly every 3 months (39 awards, most recently March 2026) — by that rhythm the next award was due around June 2026. The last award went to WYTWÓRMNIE MATERIAŁÓW BITUMICZNYCH EMULEX IRENA KALINOWSKA.n = 39
  • 64% of this buyer's awards went to companies that had already won here before (1,004 awards since 2021, spread over 347 companies). That is well above the sector norm (39%) — newcomers have a harder time here than elsewhere.n = 1,004 awards since 2021
  • Not one of the 1,004 awards with a known winner country has gone to a foreign company so far. Sector average: 1%.n = 1,004

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 30/09/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.
The Russia sanctions declaration (Art. 5k) comes with nearly every procedure — a formality, but missing it means exclusion.

Foreign bidders

In Poland · Construction materials, 26 contracts went to foreign companies over the last 3 years (of 9,154 recorded awards) — mostly from Germany, Czechia, France.

Typical field: median 3 (from 1,804 awards).

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

What the buyer is looking for

The subject of the contract is the execution of maintenance works on engineering facilities (RDW in Chojno) divided into 3 tasks: Task No 1 – Chojna Task No 2 – Gryfino Task No 3 – Police The subject-matter of the contract is described in detail in Valuated Work Dimensions, SST, Chapter C of the SWZ and the draft contract.

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

BuyerZACHODNIOPOMORSKI ZARZĄD DRÓG WOJEWÓDZKICH
TypeWorks
Estimated valuenot published — common for below-threshold procedures
Published22 September 2026
CategoryConstruction materials · CPV 44132000-4

Who has won here before

CompanyAwardsPeriod
POL-DRÓG S.A.722021–2026
MALDROBUD Sp. z o.o. Sp. K.592021–2026
PRD Nowogard S.A.292021–2026
ONDE S.A.242021–2026
S-PROBUD BUDOWA Sp. z o.o.202022–2026
From 18.0M documented awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this

20212
202210
20237
202412
20256
20267

Who knows the rhythm prepares instead of reacting.

·
days until the deadline — Thursday 8 October at 10:00

How to bid

Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.

Read the full notice — Original + documents
Goes directly to this tender on eZamówienia. The full specification and all annexes are there.
Friedrich finds tenders like this for you — every morning at 7:30, and he learns from your feedback.
Register now →