MODERNIZATION OF MUNICIPAL ROAD NO. 250302W IN BOBIN LOCALITY
MODERNIZACJA DROGI GMINNEJ NR 250302W W MIEJSCOWOŚCI BOBIN
Poland · Czerwin · how to bid here →
Your path to submission
- Deadline: 7 October at 09:00 — 1 day left.
- You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 3 months (32 awards, most recently February 2026) — by that rhythm the next award was due around April 2026. The last award went to ADVISE & BUILD SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ.n = 32
- 24% of this buyer's awards went to companies that had already won here before (60 awards since 2015, spread over 46 companies). That is well below the sector norm (44%) — this buyer switches suppliers more often than others.n = 60 awards since 2015
- Not one of the 60 awards with a known winner country has gone to a foreign company so far. Sector average: 0%.n = 60
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Poland · Construction work, 139 contracts went to foreign companies over the last 3 years (of 193,366 recorded awards) — mostly from Germany, Spain, France.
Typical field: median 5 (from 4,957 awards).
What the buyer is looking for
The subject of the contract is the performance of construction works consisting in the modernisation of the municipal road No 250302W in Bobin, Czerwin municipality, on the section from km 0+000,00 to km 0+241,50. The road covered by the contract is a class D municipal road, which acts as an access road to adjacent built-up and land properties. The scope of works includes in particular: performance of measurement and preparatory works, from husking of the ground, milling of the existing bituminous surface, demolition of the existing substructure, profiling and compaction of the ground, execution of substructure layers, execution of bituminous surface, renovation of the descent and execution of roadsides and finishing works. Works must be carried out in accordance with the design documentation, bill of quantities, STWiORB, applicable regulations, rules of technical knowledge and the terms…
Show full description
… of the contract. The measurement of works is ancillary and does not release the Contractor from the obligation to perform the full range of works resulting from the design documentation and the FTZ.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Drogi Mazowieckie Sp. z o. o. Sp. k. | 5 | 2021–2024 |
| Przedsiębiorstwo Drogowo-Mostowe Spółka Akcyjna | 4 | 2023–2025 |
| Inżynieria Pojazdów Specjalnych STRAŻAK SAM s.c. | 3 | 2022–2025 |
| Zakład Gospodarki Komunalnej w Ostrowi Mazowieckiej Sp. z o.o. | 3 | 2022–2025 |
| VIKBUD Robert Wierzbowski | 3 | 2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.