Removal of flood damage in the Iłownica river bed in sections of approximately 0.350 km between Kowale and Pogórze
Usuwanie szkód powodziowych w korycie rzeki Iłownica odcinkowo na dł. ok.0,350 km m. Kowale, Pogórze
Poland · Warszawa · how to bid here →
Your path to submission
- Deadline: 7 October at 09:00 — 4 days left.
- You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every month (1800 awards, most recently September 2026) — the next award is due around October 2026 by that rhythm. The last award went to KOLANKIEWICZ ADAM, P.H.U. Esperton Kolankiewicz Adam.n = 1,800
- 51% of this buyer's awards went to companies that had already won here before (8,929 awards since 2018, spread over 2,803 companies). 49% went to new names.n = 8,929 awards since 2018
- The median procedure drew 4 bids (5,305 procedures with a bid count); 18% ended with a single bidder. Sector: median 5 bids.n = 5,305
- The award came in at a median 69% of the estimated value (441 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 83%.n = 441
- 98% of the bids received came from small and medium-sized enterprises (1,848 procedures with a bid mix). Sector: 84%.n = 1,848
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 02/10/2026.
Foreign bidders
In Poland · Construction work, 138 contracts went to foreign companies over the last 3 years (of 192,928 recorded awards) — mostly from Germany, Spain, France.
Typical field: median 7 (from 27 awards).
What the buyer is looking for
- natural supervision - logging of bushes, management of material on its own - felling of trees, fragmentation of material and management on its own - removal of harvested wood to the storage site - cleaning of the area after clearing from small branches and bark with removal - reprofiling of slopes and the bottom of the watercourse - unplanting of the ground extracted from the excavations - making lining from forest fauna thick. layer 20cm - making a layer of facing stone from boulders the size of min. 80cm, mechanically wedged overlay - building a trench on the skarpie - making a layer of facing stone in the bottom from boulders the size of min. 50cm, mechanically wedged overlay - making double bands from hooks. 15cm - stone bedspread over the headband made of boulders the size of min. 25-20cm, mechanically wedged bedspread - repair of volley-stone structures, 20% of recovered stone,…
Show full description
… new baskets - palisade made of pegs 10-12cm l=1.5m depth of penetration 1.2 m - manual planting of the surface of native land - sowing of slopes
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| DREW-KOS Sp. Z o.o. | 71 | 2024–2026 |
| Hydrowodkan Sp. z o.o. | 60 | 2018–2026 |
| METALZBYT-HURT SP. Z O.O. | 56 | 2020–2026 |
| ATRA Sp. z o.o. | 50 | 2022–2026 |
| PBW INŻYNIERIA Sp. z o. o. | 39 | 2021–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.