"Construction works in the office building of Nadleśnictwo Świebodzin" – II proceedings

"Wykonanie robót budowlanych w budynku biurowym Nadleśnictwa Świebodzin” – II postępowanie

Poland · Świebodzin · how to bid here →

Your path to submission

  1. Deadline: 6 October at 09:00 — 1 day left.
  2. You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
  3. Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

Clement What the numbers say about this buyer

  • In this sector the buyer awards roughly every 5 months (7 awards, most recently October 2024) — by that rhythm the next award was due around March 2025. The last award went to ASBUD Spółka z ograniczoną odpowiedzialnością.n = 7
  • 20% of this buyer's awards went to companies that had already won here before (26 awards since 2021, spread over 21 companies). That is well below the sector norm (44%) — this buyer switches suppliers more often than others.n = 26 awards since 2021
  • Not one of the 26 awards with a known winner country has gone to a foreign company so far. Sector average: 0%.n = 26

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.
Anything unclear? Bidder questions are your right — ask in writing, the answer goes to everyone.

Foreign bidders

In Poland · Construction work, 139 contracts went to foreign companies over the last 3 years (of 193,358 recorded awards) — mostly from Germany, Spain, France.

Typical field: median 5 (from 4,943 awards).

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

What the buyer is looking for

1) The subject of the contract are construction works and investment works divided into two segments, i.e. segment A (No. 105/27) and segment B (inv. 105/3293). The task includes construction works constituting an increase in the value of existing construction works and the execution of construction works inside the building of the Świebodzin Forest District Headquarters (a building consisting of two segments, i.e. A – old historic villa and part B – contemporary building built in 2019). The function of the entire facility – office. (a) In the construction works for segment A, the following shall be carried out: (a) disassembly of doors and door frames within the secretariat and installation of new joinery; (b) local repairs of walls along with priming painting and wallpapering (using wallpapers taken from the Ordering Party's photos) in the rooms indicated according to the design; (c)…

Show full description

… disassembly and re-assembly in designated places (according to the design) of information boards in communication routes; (d) installation of the lift in the existing hanging ceiling located in the office of the Forest District; (e) in the hall, the replacement of the radiator from the existing one to the decorative one (2 pcs). (b) As part of the construction works for segment B, the following must be carried out: (a) construction work for the repair of cracks, priming and painting of premises. Rooms without system suspended ceilings with coffers (e.g. toilets) need to renew the surface of the ceilings by primer and paint; (b) installation of a g-k slab cavity on the rack in the above-mentioned cavity at the elevator; (c) in a social room (‘Kitchen’) replace in existing buildings the cladding with a system - tempered wall glass; (d) in designated office rooms, on individual walls, photo wallpapers should be applied (material in the form of photos will be made available by the Ordering Party); (e) an exhaust fan shall be installed in the social room (‘kitchen’) with connection and connection to the chimney chess in the adjacent hygienic and sanitary room. An under-cabinet kitchen hood should be installed for existing cabinets; (f) fireplaces – roof launchers shall be installed within the roof; (g) ceiling lamps should be installed at the lift, taking into account changes in the location of sockets. (c) As part of investment works for segment A, the following should be carried out: (a) system wood-like cladding - "English" wall paneling; (b) system wood-like cladding - lamellas; (c) system wood-like cladding – decorative panels to be installed at the entrance door to individual rooms, together with information plates; (d) installation of smooth panels in the cavities of the hoods at the stairway; (e) delivery and installation of fabric-printed paintings – canvas weighing 300-360 g/m2 on a furniture board, large-format in the form of graphics (selected by the Ordering Party); (f) delivery and assembly of images printed on fabric – canvas weighing 300-360 g/m2 illuminated, images in the form of graphics (selected by the Ordering Party); (g) supply and installation of furniture with equipment – built-in cabinets; (h) supply and installation of furniture with equipment – built-in reception counter; (i) the delivery and assembly of the 3D logo together with the letters; (j) installation of 120 cm diameter RING ceiling lamps; (k) installation of led clinker lamps at rests; (l) delivery and installation of wall hangers in the installation on the panel. (d) As part of investment works for segment B, the following must be carried out: (a) within traffic routes, local buildings made of wood-like system cladding – ‘English’ wall panelling at resting places; (b) installation of a wall panel with a lamella (local decorative element) in the cavity near the elevator shaft and within the corridor; (c) wood-like system cladding – spot panels at the entrances to individual rooms (offices, conference room, etc.); (d) wood-like cladding, system - slats (painted - in the corridor, wooden at the entrance to the meeting room); (e) install wood-like decorative panels with information plates at the door joinery; (f) on the other walls of the

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

BuyerNadleśnictwo Świebodzin
TypeWorks
Estimated value387.976 PLN
Published21 September 2026
CategoryConstruction work · CPV 45000000-7

Who has won here before

CompanyAwardsPeriod
Apexim Bis Sp. z o.o.32021–2025
UNIMOT ENERGIA I GAZ SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ22023
Perfect Security Orest Kulik22021–2023
Przedsiębiorstwo Odzieżowe "DRWAL" Sp z o.o.22025–2026
EDAM Edward Gromiak12025
From 18.0M documented awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this

20214
20221
20231
20242
20262

Who knows the rhythm prepares instead of reacting.

·
days until the deadline — Tuesday 6 October at 09:00

How to bid

Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.

Read the full notice — Original + documents
Goes directly to this tender on eZamówienia. The full specification and all annexes are there.
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now →