Repair of Podmiejska Street and repair of Wyszyński Street including bicycle path in Gorzów Wlkp.
Remont ul. Podmiejskiej oraz remont ul. Wyszyńskiego w zakresie drogi rowerowej w Gorzowie Wlkp.
Poland · Gorzów Wielkopolski · how to bid here →
Your path to submission
- Deadline: 6 October at 09:00 — 1 day left.
- You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every month (155 awards, most recently August 2026) — by that rhythm the next award was due around September 2026. The last award went to Usługi Sprzętowo - Transportowe Karol Wiącek.n = 155
- The median procedure drew 2 bids (34 procedures with a bid count); 47% ended with a single bidder. Sector: median 5 bids.n = 34
- 43% of this buyer's awards went to companies that had already won here before (416 awards since 2015, spread over 211 companies). 57% went to new names.n = 416 awards since 2015
- 1% of awards went to companies from abroad (416 awards with a known winner country). Sector average: 0%.n = 416
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Poland · Construction work, 139 contracts went to foreign companies over the last 3 years (of 193,358 recorded awards) — mostly from Germany, Spain, France.
Typical field: median 5 (from 4,943 awards).
What the buyer is looking for
1. Partial Order No 1: Renovation of ul. The subject of the contract is the execution of construction works related to the renovation of ul. Suburban in Gorzów Wlkp. The contract covers the renovation of the national road No. 22 on a section with a total length of approx. 912 m. The investment is located on plot No 2195-Obręb: 03 the waffles. In order to improve traffic conditions on the street in question, its renovation was designed by milling the existing degraded bituminous layer to a thickness of 5 cm and making a new wear layer with SMA 11 thickness of 5 cm. The scope of the task also includes the regulation of wells and rainwater drains along with the performance of horizontal markings. The works will be carried out on the basis of the notification of the works to the architectural and construction administration. The scope of the works to be carried out and the technology of the…
Show full description
… works shall be determined in particular by: a) Design documentation, b) Technical specifications for the execution and acceptance of works c) Table of Billing Elements, d) Draft contract Requirements for the Road Works Manager The road works manager will perform the following activities when performing the subject of the contract: organizing and managing the construction in a manner consistent with the simplified draft work plan, SST, the requirements of the Ordering Party, regulations, including technical construction and health and safety regulations, protocol takeover from the Ordering Party and adequate protection of the construction site, informing the owners of the property in the nearby works about the difficulties, keeping construction documentation, notifying the Ordering Party to check or receive the performed covered or disappearing works, supervising the quality and timeliness of performed works, coordinating the work of own forces and subcontractors, conducting analysis and progress of works, preparing post-contract and acceptance documentation, preparing financial and material settlements. The performance of the contract is governed by Polish law, including in particular the Construction Law Act of 7 July 1994, the Civil Code Act of 23 April 1964 and the Public Procurement Law Act of 11 September 2019. Note: The documents describing the subject-matter of the contract should be treated as mutually explanatory and complementary in the sense that if any ambiguity or ambiguity of performance is found, the Contractor will not be able to limit the scope of his obligation or the scope of due diligence. If the names of materials and adopted technology appear in the Description of the Subject of the Order, in the Design Documentation and in the Technical Specifications for the Execution and Acceptance of Construction Works, they should be understood as specifying the required technical parameters or quality standards. This means that the Ordering Party allows the submission of offers equivalent to the materials and equipment used, while maintaining their quality requirements. 2. Partial Order No 2: Renovation of ul. The subject of the contract is the execution of construction works related to the renovation of ul. Suburban in Gorzów Wlkp. in terms of replacing the surface of the bicycle road. The contract covers the renovation of the provincial road No. 151 on a section with a total length of approx. 1 300 m. The investment is located on plots of land register No 2476; 2477; 2475; 2474; 2307/2 - Boundary: 02 of Minnesota. In order to improve traffic conditions on the street in question, its renovation was designed in terms of replacing the surface of the bicycle path and renovating the exit of ul. The emerald one. The construction works will consist in dismantling the existing pavement from the concrete cube and making a basic foundation from broken aggregate / mechanically stabilized cutter with a grain size of 0/31,5 with a thickness of 6 cm (the material of the ordering party) together with a new abrasive layer of asphalt concrete AC 8 S with a thickness of 5 cm. The location of paving made of concrete paving stone , gr. 8 cm in gray on the underside
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Usługi Sprzętowo - Transportowe K. Wiącek | 14 | 2021–2026 |
| Prywatne Przedsiębiorstwo Usługowo-Drogowe „DROGUS” Krzysztof Wiącek | 13 | 2021–2026 |
| F.P.H.U. CHEĆKO Jacek Chećko | 13 | 2022–2025 |
| Zakład Projektowania i Usług Komunalnych „PORAJ” | 10 | 2021–2025 |
| INNEKO RCS sp. z o.o. | 10 | 2021–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.