Adaptation of premises in Niwiska for MDS with development of necessary documentation
Dostosowanie pomieszczeń w Niwiskach na MDS z opracowaniem niezbędnej dokumentacji
Poland · Mokobody · how to bid here →
Your path to submission
- Deadline: 6 October at 10:00 — 1 day left.
- You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (54 awards, most recently July 2026) — by that rhythm the next award was due around September 2026. The last award went to Przedsiębiorstwo Robót Drogowo-Mostowych” MIKST” Sp. z o. o.n = 54
- 16% of this buyer's awards went to companies that had already won here before (77 awards since 2021, spread over 65 companies). That is well below the sector norm (44%) — this buyer switches suppliers more often than others.n = 77 awards since 2021
- Not one of the 77 awards with a known winner country has gone to a foreign company so far. Sector average: 0%.n = 77
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Poland · Construction work, 139 contracts went to foreign companies over the last 3 years (of 193,358 recorded awards) — mostly from Germany, Spain, France.
Typical field: median 5 (from 4,943 awards).
What the buyer is looking for
The object of the construction project is the reconstruction and extension of the underground floor of the building at ul. Brewery 1 in Niwiska in a way that allows to organize a place of emergency shelter (MDS) together with the construction of a backup exit in the form of an underground tunnel ending with a shaft with an emergency hatch. Tunnel designed at the south-eastern corner of the building with mileage under the existing passage. As part of the construction project, it is provided in particular for: • maintaining the existing access to the underground floor from the internal staircase, while ensuring the required fire separation; • separation of the underground storey as a separate fire zone, including the execution of the required closures and fire seals of installation passages in places where internal installations pass through the ceiling constituting the boundary of fire…
Show full description
… zones between the underground storey and the above-ground storey; • rebuilding the existing external entrance to the underground floor and adapting it to the function of the escape exit, including in particular changing the direction of opening the door, adjusting the width of the door opening and separating the entrance from the space intended for shelter by means of a fire vestibule; • a protective roof over the external entrance to the space intended for use as an MDS, in a structure made of steel profiles, covered with trapezoidal sheet, acting as a protective cover for the entrance in accordance with the requirements for emergency shelters. • making an independent backup exit in the form of an underground tunnel ending with an embankment, located in the green area from the side of ul. It's Siedlecka. The backup exit is designed as part of the extension of the underground floor, providing the possibility to leave the shelter space regardless of the basic exit routes from the building; • in connection with the construction of the underground tunnel, a local reconstruction of existing installations and equipment interfering with the designed elements is envisaged. • As part of the gas installation, an electromagnetic valve is planned to cut off the supply of gaseous fuel type MAG-3, located in an external box on the fence of the household sewage treatment plant. • separation of the technical room, intended for the equipment and installation elements necessary for the operation of the building and the designed protective function; • the conversion of an existing room into a sanitary room, including the installation and equipment necessary for its intended function; • reinforcement of the existing ceiling above the underground floor with steel beams. The designed reinforcement will result in a local decrease in the usable height of the storey by approx. 20 cm. In connection with the introduction of reinforcement elements, appropriate reconstruction and adaptation of the routes of existing installations under the ceiling is envisaged; • adapting the ventilation of the underground floor to the designed needs, including the implementation of air vents in the form of ‘Z’-type ducts, made of ducts made of steel sheet, together with the necessary passages through building partitions and protective elements; • bricking of existing window openings in the external walls of the underground storey, to the extent resulting from the designed protective function. • reconstruction and adaptation of existing internal installations to the extent necessary to implement the designed construction, construction, sanitary and functional solutions; • renovation and adaptation of the interior finish of the underground floor, including in particular repair and execution of appropriate finishing layers of walls, ceilings and floors in the scope covered by the study. • performance of repair works within damp walls of the underground floor, including in particular removal of degraded and damp finishing layers, drying of partitions, removal of the effects of dampness and execution
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| P.W.WIKRUSZ Adam Witkowski | 5 | 2023–2025 |
| PK Technologie Sp. z o.o | 2 | 2023 |
| Marcin Polkowski F.H.U. Edmar | 2 | 2023 |
| PRZEDSIĘBIORSTWO ROBÓT DROGOWYCH REGIONALNE DROGI PODLASKIE Sp. z o.o. | 2 | 2021 |
| Zakład Utylizacji Odpadów Sp. z o. o. | 2 | 2021–2023 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.