Roboty budowlane polegające na budowie altany w Nowych Skoszewach
Poland · Łódź · how to bid here →
Your path to submission
- Deadline: 2 October at 06:15 — 13 days left.
- You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (36 awards, most recently September 2026) — the next award is due around November 2026 by that rhythm. The last award went to Grupa AMB Budownictwo Sp. z o.o..n = 36
- The median procedure drew 2 bids (12 procedures with a bid count); 33% ended with a single bidder. Sector: median 5 bids.n = 12
- 41% of this buyer's awards went to companies that had already won here before (76 awards since 2019, spread over 37 companies). 59% went to new names.n = 76 awards since 2019
- 1% of awards went to companies from abroad (76 awards with a known winner country). Sector average: 0%.n = 76
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 13/09/2026.
Foreign bidders
In Poland · Construction work, 134 contracts went to foreign companies over the last 3 years (of 191,301 recorded awards) — mostly from Germany, France, Spain.
Typical field: median 5 (from 4,826 awards).
What the buyer is looking for
The summary in English is being prepared. The official description below is in the original language (DE).
Show original description (DE)
3.1. Przedmiotem niniejszego zamówienia są roboty budowlane polegające na budowie altany na placu sołeckim w Nowych Skoszewach w gminie Nowosolna w ramach zadania „Centrum wsi Nowe Skoszewy – nasze centrum integracji”. 3.2. Przedmiot zamówienia został szczegółowo określony w: - Projekcie Umowy - załącznik nr 8 do SWZ, - Dokumentacji Projektowej – załącznik nr 7 do SWZ, - Przedmiarze robót – załącznik nr 9 do SWZ
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| PGM PROJEKT Sp. z o.o. | 14 | 2021–2025 |
| Grupa AMB Budownictwo Sp. z o.o. | 5 | 2024–2026 |
| Moje Bambino Sp. z o.o. | 4 | 2025 |
| Przedsiębiorstwo Budowy Dróg i Mostów "ERBEDIM" Sp. z o.o. | 4 | 2021–2024 |
| Towarzystwo Ubezpieczeń Wzajemnych “TUW” | 3 | 2022–2024 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.