Reconstruction of county road 4741 S – Kazimierzówka Street in Dziewki – sidewalk construction – phase II
Przebudowa drogi powiatowej 4741 S – ul. Kazimierzówka w Dziewkach – budowa chodnika – etap II
Poland · Rogoźnik · how to bid here →
Your path to submission
- Deadline: 1 October at 08:00 — 13 days left.
- You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (112 awards, most recently July 2026) — by that rhythm the next award was due around September 2026. The last award went to PRDiU Katarzyna Kyrcz.n = 112
- The median procedure drew just one bid (11 procedures with a bid count); 73% ended with a single bidder. Sector: median 5 bids.n = 11
- 60% of this buyer's awards went to companies that had already won here before (141 awards since 2015, spread over 50 companies). That is well above the sector norm (44%) — newcomers have a harder time here than elsewhere.n = 141 awards since 2015
- Not one of the 141 awards with a known winner country has gone to a foreign company so far. Sector average: 0%.n = 141
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 13/09/2026.
Foreign bidders
In Poland · Construction work, 134 contracts went to foreign companies over the last 3 years (of 191,088 recorded awards) — mostly from Germany, France, Spain.
Typical field: median 5 (from 4,817 awards).
What the buyer is looking for
The summary in English is being prepared. The official description below is in the original language (DE).
Show original description (DE)
Przewidywany zakres zakłada budowę chodnika przy ul. Kazimierzówka w Dziewkach na odcinku ~192m od zakończenia etapu I do końca opracowania zgodnie z załączonym do przetargu planem sytuacyjnym. Szczegółowy opis przedmiotu zamówienia obejmuje załącznik nr 4a – przedmiar robót oraz załącznik nr 4b – dokumentacja projektowa.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| P.P.U.H. „LIBUD” LIBERDA Sp.j. | 16 | 2021–2024 |
| Przedsiębiorstwo Robót Drogowych i Usługowych Katarzyna Kyrcz | 16 | 2022–2026 |
| Arkadiusz Mika Przedsiębiorstwo Usługowo Handlowe "DOMAX" | 11 | 2021–2025 |
| LIBUD ASFALTY Sp. z o.o. | 8 | 2025–2026 |
| DROGOPOL Sp. z o.o. | 5 | 2021–2024 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.