Expansion of the maneuvering area and construction of a fire protection tank
Rozbudowa placu manewrowego oraz budowa zbiornika przeciwpożarowego
Poland · Korolówka-Osada · how to bid here →
Your path to submission
- Deadline: 1 October at 08:00 — 15 days left.
- You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 8 months (15 awards, most recently September 2026) — the next award is due around May 2027 by that rhythm. The last award went to ABART, Szymon Budzyński.n = 15
- 19% of this buyer's awards went to companies that had already won here before (32 awards since 2021, spread over 26 companies). That is well below the sector norm (44%) — this buyer switches suppliers more often than others.n = 32 awards since 2021
- Not one of the 32 awards with a known winner country has gone to a foreign company so far. Sector average: 0%.n = 32
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 13/09/2026.
Foreign bidders
In Poland · Construction work, 134 contracts went to foreign companies over the last 3 years (of 190,843 recorded awards) — mostly from Germany, France, Spain.
Typical field: median 5 (from 4,804 awards).
What the buyer is looking for
The summary in English is being prepared. The official description below is in the original language (DE).
Show original description (DE)
Przedmiotem zamówienia są roboty budowlane polegające na rozbudowie placu manewrowego o wymiarach 30,45 m x 25 m oraz budowie przeciwpożarowego zbiornika wodnego o pojemności 100 m3. Szczegółowy opis przedmiotu stanowią przedmiary robót oraz dokumentacja projektowa - odpowiednio Załączniki nr 1 oraz 1a do SWZ.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Drewbud Krzowski Andrzej | 4 | 2022–2023 |
| MK Mikro Energia Kazimierz Martychowiec | 2 | 2022–2023 |
| Andrzej Piotrowski - STAL - MAX | 2 | 2025 |
| Przedsiębiorstwo Handlowo - Usługowe Chomiuk Krzysztof | 2 | 2026 |
| P.P.H.U.Astal-Konstrukcje Stalowe Sylwester Pogonowski | 1 | 2023 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.