"Execution of construction and building expertise along with technical condition assessment of buildings – Part III"
„Wykonanie ekspertyz konstrukcyjno- budowlanych wraz z oceną stanu technicznego budynków – III części”
Poland · Warszawa · how to bid here →
Your path to submission
- Deadline: 23 September at 08:00 — 7 days left.
- You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 4 months (25 awards, most recently May 2026) — the next award is due around September 2026 by that rhythm. The last award went to Studio Budowlane "UNITY" s.c. Małgorzata Tischner, Damian Cytra.n = 25
- 59% of this buyer's awards went to companies that had already won here before (381 awards since 2015, spread over 134 companies). That is well above the sector norm (33%) — newcomers have a harder time here than elsewhere.n = 381 awards since 2015
- The median procedure drew 3 bids (33 procedures with a bid count); 18% ended with a single bidder. Sector: median 4 bids.n = 33
- Not one of the 381 awards with a known winner country has gone to a foreign company so far. Sector average: 0%.n = 381
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 13/09/2026.
Foreign bidders
In Poland · Architecture & engineering, 111 contracts went to foreign companies over the last 3 years (of 39,561 recorded awards) — mostly from Germany, France, Switzerland.
Typical field: median 3 (from 4 awards).
What the buyer is looking for
1. 1) Part I - Execution of a construction and construction expert opinion on the technical condition of 8 buildings: Korytnicka 21, Mlandzka 30, Osiecka 54, Osiecka 58, Osowska 36, Katowicka 5, Gdecka 17, Kawcza 47 2. 2) Part II - Execution of a construction and construction expert opinion on the technical condition of 8 buildings: Grochowska 280, Hetmańska 21, Hetmańska 26, Kobielska 70, Lubartowska 21, Łysogórska 8, Nizinna 26, Prochowa 16 3. 3) Part III - Execution of a construction and construction expert opinion on the technical condition of 8 buildings: Powder 18, Powder 22, Czechowicka 2, Serocka 34, Berneńska 2, Leipzig 40, Powder 32, Wind 28a
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| P.P.H.U "Compo" Janusz Krzysztof Soin | 37 | 2021–2026 |
| Lider - Zakład Budowlano-Instalacyjny Stanisław Pyl, | 21 | 2021–2025 |
| P.P.H.U. Elektromechanika-Hydraulika Adaszewski Artur | 17 | 2021–2026 |
| Firma Usługowo-Handlowa „HOSTA” Iwona Łapińska | 13 | 2021–2025 |
| SKROMAK sp. z o.o. | 13 | 2024–2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.