Winter maintenance of roads under the management of the Head of Kłaj Municipality in the 2026/2027 season
Zimowe utrzymanie dróg pozostających w zarządzie Wójta Gminy Kłaj w sezonie 2026/2027
Poland · Kłaj · how to bid here →
Your path to submission
- Deadline: 23 September at 08:00 — 7 days left.
- You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 6 months (15 awards, most recently December 2025) — by that rhythm the next award was due around June 2026. The last award went to MAŁOPOLSKIE PRZEDSIĘBIORSTWO GOSPODARKI ODPADAMI SP. Z O.O..n = 15
- 28% of this buyer's awards went to companies that had already won here before (84 awards since 2015, spread over 52 companies). That is well below the sector norm (47%) — this buyer switches suppliers more often than others.n = 84 awards since 2015
- The median procedure drew just one bid (8 procedures with a bid count); 63% ended with a single bidder. Sector: median 3 bids.n = 8
- 1% of awards went to companies from abroad (84 awards with a known winner country). Sector average: 0%.n = 84
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 13/09/2026.
Foreign bidders
In Poland · Cleaning, environment & waste, 40 contracts went to foreign companies over the last 3 years (of 56,363 recorded awards) — mostly from Bulgaria, France, Czechia.
Typical field: median 3 (from 16,234 awards).
What the buyer is looking for
1. The subject of the contract includes the provision of the above service in the area of: a. for Part 1: Klaj, Targowisko, Łężkowice and Grodkowice; The service should be performed under the following conditions (for both parts): 1) deformation and cleansing of road surfaces and the order of winter maintenance up to an hour. 600 every day; 2) deformation and cleansing of road surfaces in the second order of winter maintenance up to 1 hour. 900 each day; 3) standby (passive action) during the period: 15.10.2026 – 15.04.2027. The winter action will be carried out only by telephone notification of the Ordering Party. The contractor is obliged to immediately start the action after receiving the notification and conduct it in a way that ensures proper and careful performance of the subject of the contract. Maintaining readiness (passive action) will take place only upon notification of the…
Show full description
… Ordering Party and until further notice by the Ordering Party. The Contractor is obliged to keep a book of orders in the form of daily reports, which will include information on the type of equipment used, the number of hours of operation of a given equipment, the amount of waste material to be sprinkled and its type, the place of provision of the service. Daily reports confirmed by the coordinators on behalf of the Ordering Party will form the basis for the settlement of the service; 4) after the end of the period of binding the contract, the Contractor shall remove the aggregate accumulated at the curbs at his own expense and effort once; A detailed description of the subject of the contract can be found in the content of the SWZ. 2. The subject of the contract includes the provision of the above service in the area of: a. for Part 2: Szarów, Dąbrowa, Łysokanie and Brzezie (together with the Pear parish). The service should be performed under the following conditions (for both parts): 1) deformation and cleansing of road surfaces and the order of winter maintenance up to an hour. 600 every day; 2) deformation and cleansing of road surfaces in the second order of winter maintenance up to 1 hour. 900 each day; 3) standby (passive action) during the period: 15.10.2026 – 15.04.2027. The winter action will be carried out only by telephone notification of the Ordering Party. The contractor is obliged to immediately start the action after receiving the notification and conduct it in a way that ensures proper and careful performance of the subject of the contract. Maintaining readiness (passive action) will take place only upon notification of the Ordering Party and until further notice by the Ordering Party. The Contractor is obliged to keep a book of orders in the form of daily reports, which will include information on the type of equipment used, the number of hours of operation of a given equipment, the amount of waste material to be sprinkled and its type, the place of provision of the service. Daily reports confirmed by the coordinators on behalf of the Ordering Party will form the basis for the settlement of the service; 4) after the end of the period of binding the contract, the Contractor shall remove the aggregate accumulated at the curbs at his own expense and effort once; A detailed description of the subject of the contract can be found in the content of the SWZ.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| MAŁOPOLSKIE PRZEDSIĘBIORSTWO GOSPODARKI ODPADAMI SP. Z O. O. | 6 | 2021–2025 |
| Zakład Usług Rolniczych i Budowlanych AGROBUD Wiesław Nowakowski | 4 | 2022–2025 |
| DESINN SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIA | 3 | 2023–2025 |
| PHU "INKO 2001" K. ŁUKASIK, K. KACZOR, J.MAJEWSKI SPÓŁKA JAWNA | 3 | 2023–2025 |
| InterRisk TU SA Vienna Insurance Group | 2 | 2024–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.