Friedrich & ClementBETA

Preparation of project documentation – Construction of a pedestrian and bicycle path on Strzechy Street (from Dębowa Street to DW928) in Mikołów

Opracowanie dokumentacji projektowej – Budowa drogi dla pieszych i rowerów na ul. Strzechy (od ul. Dębowej do DW928) w Mikołowie

Poland · Mikołów · how to bid here

Your path to submission

  1. Deadline: 23 September at 08:00 — 7 days left.
  2. You submit on eZamówienia — not here and not by e-mail. Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
  3. Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

Clement What the numbers say about this buyer

  • In this sector the buyer awards roughly every 2 months (59 awards, most recently May 2026) — by that rhythm the next award was due around July 2026. The last award went to Npro Katarzyna Kalata-Nieużyła.n = 59
  • The median procedure drew 2 bids (30 procedures with a bid count); 47% ended with a single bidder. Sector: median 4 bids.n = 30
  • 33% of this buyer's awards went to companies that had already won here before (262 awards since 2015, spread over 150 companies). 67% went to new names.n = 262 awards since 2015
  • 2% of awards went to companies from abroad (262 awards with a known winner country). Sector average: 0%.n = 262
  • 0% of the bids received came from other countries (6 procedures with a bid mix) — all bidders, not just the winners. Sector: 1%.n = 6

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 13/09/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.
The Russia sanctions declaration (Art. 5k) comes with nearly every procedure — a formality, but missing it means exclusion.

Foreign bidders

In Poland · Architecture & engineering, 111 contracts went to foreign companies over the last 3 years (of 39,561 recorded awards) — mostly from Germany, France, Switzerland.

Typical field: median 4 (from 4,523 awards).

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

What the buyer is looking for

The subject of the contract is the preparation of design and cost documentation together with obtaining a building permit decision for the implementation of the investment consisting in the construction of a pedestrian road and bicycles within ul. Strzechy (DG380043S) on the section from ul. Dębowa (DG380044S) to ul. Bielska (DW928). 1) map development for design purposes preceded by an update of geodetic map sleepers and an inventory of ground and underground weapon networks ; 2) obtaining an extract and an outline from the local spatial development plan (if necessary); 3) obtaining extracts from the land and buildings register; 4) determining collisions and obtaining technical conditions for the reconstruction and protection of existing weapon networks of the area; 5) performing tests and wells aimed at developing the necessary geotechnical documentation, i.e. geotechnical opinion and

Show full description

documentation from ground tests together with a geotechnical design (if necessary), allowing for the correct assessment of the geotechnical conditions of the ground and the design of the surface structure; 6) preparation of a land development project, architectural and construction design and technical design in 4 copies in paper and electronic version on a magnetic medium in PDF format and editable DWG and DOC, taking into account in particular a) design of the construction of a two-way road for pedestrians and bicycles within ul. Thatch (DG380043S) with a width of min. 3.00 m and a length of approx. 220m on the section from ul. Dębowa (DG380044S) to ul. Bielska (DW928)including: - connecting it with the existing ground road located on plot No. wid. 1535/38 (area 0029 Mikołów); - its connection with the existing road for pedestrians and bicycles within ul. Bielska (DW928); - maintaining the required road gauge, the width of safety belts and the distance from the edges of the edges to the edges of the road for pedestrians and bicycles; b) designing the reconstruction of the existing ul. Thatch (DG380043S) on the section covered by the construction of a road for pedestrians and bicycles, consisting of: unilateral demolition of the existing road surface to the extent necessary to obtain space for the construction of the above-mentioned pedestrian and bicycle road within the limits of real estate owned by the Municipality of Mikołów; - construction of a widening of the roadway on the other side of ul. Thatches up to a fixed width of 5,00 m (2x2,50m); - construction of the KR3 road surface on the entire width of ul. Thatches adapted to the identified geotechnical conditions of the substrate; - redevelopment of existing exits; - profiling slopes, slopes and greenery in adjacent areas, located within the boundaries of properties owned by the Municipality of Mikołów covered by the scope of the study. c) designing the construction of rainwater sewage system within ul. Thatchings on the reconstructed section; d) designing the construction of lighting for bicycle crossings using at least 2 LED street lighting fixtures (if it is necessary to design bicycle crossings); e) designing a technological channel within ul. Thatchings on the reconstructed section; f) design of the reconstruction and protection of existing land weapon networks on the basis of technical conditions issued by the owners or administrators of these networks; g) inventory of existing greenery with a greenery felling plan and a replacement planting plan if necessary. h) design of road greenery in the form of lawns and plantings (regardless of the need to make possible replacement plantings) along the planned street section with the use of existing stands (if possible); 7) obtaining all arrangements, opinions, permits and decisions required by law necessary to implement the construction plan, in particular a) a final decision on the environmental conditions for consent to the implementation of the project, or the position of the competent authority on the lack of necessity

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

BuyerGmina Mikołów
TypeServices
Estimated valuenot published — common for below-threshold procedures
Published15 September 2026
CategoryArchitecture & engineering · CPV 71320000-7

Who has won here before

CompanyAwardsPeriod
Tetla Szymon DROGRÓD122021–2026
Esri Polska Sp. z o.o.62021–2026
Przedsiębiorstwo Produkcyjno-Handlowo-Usługowe „ALG” Andrzej Gasz62021–2026
Elektroserwis Wachowiak Sp. z o.o. Sp. k.52025–2026
COMPLEX S. C. Grzegorz Janik, Mirosław Michoń52022–2026
From 13.7M documented awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this

20218
202219
20239
20249
20259
202616

Who knows the rhythm prepares instead of reacting.

·
days until the deadlineWednesday 23 September at 08:00

How to bid

Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.

Read the full noticeOriginal + documents
Goes directly to this tender on eZamówienia. The full specification and all annexes are there.
Tenders like this, every morning at 7:30 in your inbox.
Register now →