Successive delivery of crushed aggregate for unpaved roads managed by the Municipality of Dobre Miasto
Sukcesywna dostawa kruszywa łamanego na drogi gruntowe będące w zarządzaniu Gminy Dobre Miasto
Poland · Dobre Miasto · how to bid here →
Your path to submission
- Deadline: 23 September at 08:00 — 7 days left.
- You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- 29% of this buyer's awards went to companies that had already won here before (76 awards since 2019, spread over 49 companies). That is well below the sector norm (47%) — this buyer switches suppliers more often than others.n = 76 awards since 2019
- The median procedure drew just one bid (12 procedures with a bid count); 83% ended with a single bidder. Sector: median 3 bids.n = 12
- 3% of awards went to companies from abroad (76 awards with a known winner country). Sector average: 0%.n = 76
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 16/09/2026.
Foreign bidders
In Poland · Mining & minerals, 1 contracts went to foreign companies over the last 3 years (of 3,754 recorded awards).
Typical field: median 3 (from 266 awards).
What the buyer is looking for
1. The subject of the contract is the successive supply of crushed aggregate fraction 0-31,5mm (C90/3) and 0-63mm (C50/30) for ground roads under the management of the Commune of Dobre Miasto. 2. The subject-matter of the contract includes the supply of broken aggregates of continuous graining: 1) fraction 0-31,5mm (C90/3) in the amount of 1400 Mg 2) fraction 0-63mm (C50/30) in the amount of 1100 Mg. 3. Aggregate intended for road works must meet the standards PN-EN 13043:2004, PN-EN 13242:2004 or equivalent, should have appropriate certificates or certificates confirming compliance with the standard. 4. The Contractor shall be obliged to maintain public traffic at the place where the supplies are to take place. 5. The contractor must be prepared to deliver the aggregate of a single order in quantities of a minimum of 15 tons and a maximum of 300 tons. 6. Each time the aggregate is…
Show full description
… delivered, the Contractor is obliged to provide the Ordering Party with a storage document (WZ) from the aggregate mine confirming the actual issue of a specified amount of tonnes of aggregate to the outside, generated on the basis of weighing on the car (electronic) scale 7. At the request of the Ordering Party, the Contractor is obliged to submit a declaration of performance or other document confirming the parameters of the aggregate delivered (laboratory tests). 8. If it is not possible to enter the road with heavy-duty semi-trailers, the contractor will be obliged to provide materials with self-discharging box cars in order to complete the order. The Contractor shall be informed by the Ordering Party of the quantity of delivery. 9. The Contractor assumes full responsibility for the proper performance of deliveries, ensuring the conditions of safety, quality of materials and organizational and technical methods during the performance of the contract. The Contractor shall assume full responsibility for any damage or damage to the equipment located at the place of delivery and unloading of aggregates resulting from the deliveries carried out by the Contractor. 10. The contracting authority shall have the right to examine the aggregate delivered in terms of: quality, quantity and pollution. If any of the above circumstances is found, the Ordering Party may refuse to pay the remuneration, charge the Contractor with the costs of testing and weighing, request the replacement of aggregate (at the Contractor's expense) for meeting the requirements within no more than 24 hours from the date on which the given circumstance occurred.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Zakład Gospodarki Komunalnej Sp. z o.o. | 13 | 2022–2026 |
| Przedsiębiorstwo Budowlane "Leszczyński" Marcin Leszczyński | 5 | 2021–2025 |
| Zakład Gospodarki Komunalnej Sp. z o. o. | 3 | 2022–2026 |
| Krech Transport Anna Krech | 2 | 2023–2026 |
| Xcomp spółka z ograniczoną odpowiedzialnością sp. k. | 2 | 2022–2025 |
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.