Supply in the form of operational leasing of a factory-new backhoe loader for the needs of the Road and Green Space Management in Sopot
Dostawa w formie leasingu operacyjnego fabrycznie nowej koparko ładowarki na potrzeby Zarządu Dróg i Zieleni w Sopocie
Poland · Sopot · how to bid here →
Your path to submission
- Deadline: 22 September at 09:00 — 7 days left.
- You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- 47% of this buyer's awards went to companies that had already won here before (390 awards since 2015, spread over 191 companies). That is well above the sector norm (23%) — newcomers have a harder time here than elsewhere.n = 390 awards since 2015
- The median procedure drew just one bid (22 procedures with a bid count); 82% ended with a single bidder. Sector: median 3 bids.n = 22
- 1% of awards went to companies from abroad (390 awards with a known winner country). Sector average: 1%.n = 390
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 13/09/2026.
Foreign bidders
In Poland · Mining & construction machinery, 22 contracts went to foreign companies over the last 3 years (of 3,208 recorded awards) — mostly from Czechia, Belgium, France.
Typical field: median 3 (from 843 awards).
What the buyer is looking for
The summary in English is being prepared. The official description below is in the original language (DE).
Show original description (DE)
Dostawa w formie leasingu operacyjnego fabrycznie nowej koparko ładowarki na potrzeby Zarządu Dróg i Zieleni w Sopocie Przedmiotem zamówienia jest dostawa nowej koparko ładowarki. W zakresie przedmiotu zamówienia przewiduje się odpłatne korzystanie w ramach leasingu operacyjnego za umówione raty leasingowe w okresie 60 miesięcy od daty podpisania protokołu odbioru przedmiotu leasingu, na warunkach określonych szczegółowo w ogólnych warunkach leasingu.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Firma Budowlano– Drogowa MTM S.A. | 33 | 2021–2026 |
| Przedsiębiorstwo Inżynieryjne ALFA Przemysław Marszałkowski | 11 | 2021–2026 |
| PHU DOM Tomasz Dobkowski | 9 | 2022–2025 |
| Centrum Myśli Strategicznych | 8 | 2023–2026 |
| FIRMA BUDOWLANO - DROGOWA MTM SPÓŁKA AKCYJNA | 8 | 2021–2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.