How to bid in this country: portals, deadlines, thresholds →
Construction of a new hydraulic passenger and freight lift, 2 stops (26-28339)
Neubau eines hydraulischen Personen- und Lastenaufzugs, 2 Haltestellen (26-28339) — original title
Your path to submission
- Deadline: 23 November — 23 days left. The source says 00:00 on the following day, i.e. midnight at the end of this day. That is why we show this day — as in the search and the morning edition.
- You submit on AI Vergabeplattform — not here and not by e-mail. ↗ Free bidder account on the state platform required; electronic submission, usually plain text form. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
Contract
Type of service
Tender documents at a glance
The essentials of the tender documents, checked statement by statement against the documents. For your bid, the original documents count.
Powered by eBriefing – EU language technology. Friedrich is an independent service, not an EU offering.
✓ found in the documents · ❓ not found in the documents or general statement
Vergabeverfahren Neubau Aufzug – Hochschule der Medien Stuttgart
The input text concerns a German public procurement procedure (VOB/A, Abschnitt 2) for construction works at the Hochschule der Medien in Stuttgart, Germany.
It is an EU open procedure for “Neubau eines hydraulischen Personen- und Lastenaufzugs, 2 Haltestellen” as part of fire protection measures.
The point of view is that of a German public contracting authority (Vermögen und Bau Baden-Württemberg, Universitätsbauamt Stuttgart und Hohenheim), applying EU procurement rules and German federal/state templates; the EU is mentioned in relation to procedures and sanctions, and Russia appears only in the context of EU sanctions (Verordnung (EU) 2022/576).
Such as regarding the scope of the contract, the texts define the project as the construction of a hydraulic passenger and goods lift with two stops at Nobelstr. 10, 70569 Stuttgart, Hochschule der Medien, under measure number H.JB.51901.1611 and award number 26-28339.
The performance period is fixed in the Besondere Vertragsbedingungen (Formblatt 214): start of works on 04.01.2027 and completion/abnahmereife Fertigstellung by 09.04.2027, and these dates are expressly designated as contractual deadlines (§ 5 VOB/B).
Water and energy costs on site are borne by the client and must therefore not be priced into unit rates.
Communication and data exchange are organized via the PlanTeam-Server (PTS) and GAEB/DA XML, with the written versions of documents prevailing over data-exchange files in case of discrepancies.
Such as in relation to what bidders must submit and the qualification requirements, the Aufforderung zur Abgabe eines Angebots (Formblatt 211 EU) refers explicitly to the Verzeichnis der im Vergabeverfahren vorzulegenden Unterlagen (Formblatt 216).
As company-related proof, either a PQ number (Präqualifikation) or a completed Eigenerklärung zur Eignung (124) or EEE must be provided, including turnover for the last three business years in comparable works and confirmation of comparable projects in the last five calendar years plus, on request, reference certificates (VHB_444).
Additional confirmations (tax, social security, Berufsgenossenschaft, insolvency, Gewerbeanmeldung/Handwerkskarte/IHK, workforce structure) are to be supplied on separate request if the bid reaches the shortlist.
Such as concerning award criteria and weighting, the Aufforderung (211 EU, section 7) defines the price as a key Zuschlagskriterium; the award price is determined from the “Wertungssumme” of each offer derived from recalculated total prices, taking into account discounts, the Lohngleitklausel and the Instandhaltungsangebote.
In addition, it refers to “Mehrere Zuschlagskriterien gemäß beiliegende Anlage zu 211 EU Gewichtung der Zuschlagskriterien”, meaning that further criteria and their weighting are specified in the separate Zuschlagskriterien form (227), which is attached but not reproduced in detail in the excerpt.
Show all 25 statements
A special rule applies for workshops for disabled persons: they receive a 15% bonus in the value comparison, and where their offer is equally economical as another, the award is made to the workshop; proof of that status must be submitted with the bid.
Such as regarding risks and special conditions, the Besondere Vertragsbedingungen (214) stipulate contractual penalties (§ 11 VOB/B) for exceeding contractual deadlines: for each working day of delay on agreed partial deadlines or completion date, a penalty (either as an absolute amount or a percentage of the net contract sum) applies, overall capped at 5% of the net contract sum.
Securities for performance and defects (§ 17 VOB/B) are in principle described but explicitly waived by ticking “Auf Sicherheit wird verzichtet”; thus no performance or defect guarantee security is demanded in this tender, unless the alternative clauses become relevant for higher values (the general text mentions thresholds, but the marked “X” clauses indicate waiver).
Subcontracting and use of other companies’ capacities are allowed but strictly regulated: such companies must be named in form 233/235; on request, the bidder must present Verpflichtungserklärungen (236) including joint liability for economic/financial capacity in cases of eignungsleihe, and must replace unsuitable third parties on demand.
The contract includes special clauses on waste management (Formblatt 241) requiring the contractor to act as waste producer, ensure proper separation and disposal of construction waste, and provide all legally required evidence of orderly waste management.
Additional risk-related clauses cover cyber security incidents (mandatory notification to SITiF BW), electronic invoicing via XRechnung and the Zentrale Rechnungseingang BW, mandatory participation in Baustellenbesprechungen twice monthly, and data processing consents.
The bid binding period (Bindefrist) ends on 21.12.2026; the offer must be submitted by 23.11.2026 at 24:00 via the authority’s e-platform, in German, using prescribed forms, with electronic or written signatures as specified.
Such as in relation to contradictions or corrections within the documents, the templates explicitly resolve some potential inconsistencies.
For example, Formblatt 244 states that in case of discrepancies between electronic GAEB/DA XML files and the written versions of the tender or accounting documents, the written version is binding, and any intentional content differences must be marked in the written version by the contractor.
While the Teilnahmebedingungen EU (212) describe rules for Nebenangebote (alternative bids), the Aufforderung (211 EU, section 6.1) explicitly states “Nebenangebote sind nicht zugelassen,” thereby overriding the general possibility from the standard text; thus no alternative bids may be submitted despite the general guidance on how they would be structured.
Similarly, although the generic text in 214 outlines options for performance and defect securities, the marked boxes (“XAuf Sicherheit … wird verzichtet”) clarify that for this specific procedure the authority waives such security requirements, so the waiver is the applicable statement.
Where forms mention that certain declarations “must be submitted when required in the participation conditions,” the participation conditions (212 EU) and the Verzeichnis der Unterlagen (216) show which ones are indeed required here (e.g.
Verpflichtungserklärung 236 only on separate request; Eigenerklärung RUS-Sanktion always with the offer).
Only the contracting authority's tender documents are binding. As of: 26/10/2026
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| Trockenbau München GmbH · Puchheim | 3 | 2006–2010 |
| Lindner AG · Arnstorf | 3 | 2008–2013 |
| Lauer Industrieservice GmbH · Seeheim-Jugenheim | 2 | 2007–2010 |
| Gottschild Automatisierungstechnik GmbH · Hofbieber | 2 | 2009–2010 |
| Proklima GmbH | 2 | 2007–2008 |
How often this buyer tenders this kind of work
Tactics
When this buyer has awarded in this sector, there was usually a single bid in the end. A solid bid has a real chance here. (Based on 87 completed awards — not a statement about this procedure.)
This procedure allows 30 days between publication and deadline — typical in this country is 32 (median of 20,071 procedures). A normal window for this market.
Foreign bidders
In Germany · Construction work, 687 contracts went to foreign companies over the last 3 years (of 244,229 recorded awards) — mostly from Austria, France, Poland.
How to bid
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now