How to bid in this country: portals, deadlines, thresholds →
IFS W124, 4410.003 Sanitary Voarb measure (26-86349)
IFS W124, 4410.003 Sanitär Voarbmaßnahme (26-86349) — original title
Your path to submission
- Deadline: 17 November at 09:00 — 16 days left.
- You submit on AI Vergabeplattform — not here and not by e-mail. ↗ Free bidder account on the state platform required; electronic submission, usually plain text form. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
Contract
Type of service
Tender documents at a glance
The essentials of the tender documents, checked statement by statement against the documents. For your bid, the original documents count.
Powered by eBriefing – EU language technology. Friedrich is an independent service, not an EU offering.
✓ found in the documents · ❓ not found in the documents or general statement
Vergabeverfahren Sanitär-Vorabmaßnahme Universität Tübingen (Vergabenummer 26-86349)
The input text concerns an EU-wide open tender procedure for construction works (VOB/A, Abschnitt 2) in Germany, initiated by Vermögen und Bau Baden-Württemberg, Amt Tübingen.
The contract relates to sanitary works as a preliminary measure in the “Neuordnung, 1. BA” of the Institut für Sportwissenschaft at the University of Tübingen.
The regulatory and contractual framework is clearly German: references are to German statutes (VOB/A, VOB/B, LDSG, E-Government-Gesetz Baden-Württemberg, KrWG, Einkommensteuergesetz, Gewerbeordnung) and EU regulations (e.g.
Verordnung (EU) 2022/576 on Russia sanctions).
The documents specify in detail what bidders must submit with their offers.
Such as, the Aufforderung zur Abgabe eines Angebots (Formblatt 211 EU) and the Verzeichnis der im Vergabeverfahren vorzulegenden Unterlagen (Formblatt 216) require: the Angebotsschreiben, the priced Leistungsverzeichnis/Leistungsprogramm, Angaben zur Preisermittlung (Formblatt 221/222), the Eigenerklärung zur Eignung or PQ-Nummer/EEE, the Eigenerklärung RUS Sanktion, and—situationally—Formblätter 233 (Nachunternehmerleistungen), 234 (Bieter-/Arbeitsgemeinschaft), 235 (Leistungen anderer Unternehmen), 224 (Lohngleitklausel), 248 (Holzprodukte), 225a (Stoffpreisgleitklausel) and Instandhaltungs-Vertragsformulare.
Additionally, a “wichtiger Hinweis” mandates that the Leistungsverzeichnis must be submitted both as PDF and as a completed GAEB (DA XML) file; if that is done, schriftliche Angebote sind zwingend auszuschließen, so practically the submission is electronic via the Vergabeplattform.
On demand, the contracting authority can request Formblatt 223 (Aufgliederung der Einheitspreise), Formblatt 236 (Verpflichtungserklärung anderer Unternehmen), various corporate certificates (Gewerbeanmeldung, Handelsregisterauszug, Handwerksrolle/IHK, Unbedenklichkeitsbescheinigungen von Finanzamt, Sozialkasse, Berufsgenossenschaft, Freistellungsbescheinigung nach § 48b EStG, Insolvenzplan) as well as reference confirmations and workforce breakdowns.
Minimum qualification is demonstrated either via Präqualifikation (PQ-Verzeichnis) or via the Eigenerklärung zur Eignung, including three years’ turnover in comparable construction services, execution of comparable works in the last five years, membership in Berufsgenossenschaft, proper tax/social security payment, absence of exclusion grounds under § 6e EU VOB/A / §§ 123–125 GWB, and the ability to provide three detailed reference certificates if the bid reaches the shortlist.
Regarding the scope of the contract, the texts define what, where, and when in considerable detail.
Such as, the project is “Tübingen, Universität, Institut für Sportwissenschaft, Neuordnung, 1. BA”, at Wilhelmstr. 124, 72074 Tübingen, and covers the “Leistung IFS W124, 4410.003 Sanitär Vorabmaßnahme”.
Show all 36 statements
Formblatt 223 illustrates the technical scope through a long list of LV positions and quantities (e.g.
Guss-Abwasserleitungen mit 2K-Epoxidbeschichtung in diversen Dimensionen DN50–DN200, Passstücke, Sicherungsschellen, Rohraufhängungen, Wärmedämmungen für Rohre in bekriechbaren Kanälen und Räumen, Mineralwolle, Brandschutzabschottungen R90 in verschiedenen Nennweiten, Kennzeichnungen, etc.).
The Ausführungsfristen in the Besondere Vertragsbedingungen (Formblatt 214) stipulate start on 15.03.2027 and completion (abnahmereife Fertigstellung) on 01.10.2027, both marked as verbindliche Vertragsfristen per § 5 VOB/B.
Place of performance is clearly the University site; water and energy costs for the construction site are borne by the Auftraggeber and must not be priced into the unit rates.
Weekly site meetings with a suitable representative of the contractor are mandatory.
On award criteria and weighting, the documents state that the Zuschlagskriterium is primarily the price, determined from the “Wertungssumme” of the recalculated offer including unconditioned discounts, Lohngleitklausel-Erstattungsbeträge and any Instandhaltungsangebote.
Such as, Formblatt 211 refers to “Mehrere Zuschlagskriterien gemäß beiliegende Anlage zu 211 EU Gewichtung der Zuschlagskriterien”, but the concrete excerpt provided shows only “Zuschlagskriterium Preis” checked, implying that price is decisive in practice.
A special rule is introduced for Werkstätten für Behinderte: they receive a 15 % bonus on the Wertungssumme; if, after applying this bonus, their offer is equally economical as another, the award must go to the workshop’s offer.
The workshop status must be evidenced with the bid.
No losweise Vergabe is intended (Losweise Vergabe: nein), multiple Hauptangebote are not permitted, and Nebenangebote are allowed only in connection with a Hauptangebot, must cover the full performance needed for flawless execution, and must meet predefined Mindestanforderungen (Formblatt 226).
Nebenangebote must be clearly described and broken down with quantities and unit prices following § 4 der Teilnahmebedingungen EU.
Risks and special conditions are covered extensively via Besondere Vertragsbedingungen, Abfall, Datenverarbeitung, Stammpersonal and security-related clauses.
Such as, Formblatt 214 sets contractual penalties (Vertragsstrafen) for each day of delay in meeting contractual deadlines (start and completion, and any additional Einzelfristen that might be specified), capped at 5 % of the net contract sum.
Security for contract performance is generally waived, but for contracts ≥ 250,000 € (net) the contractor must provide 5 % performance security if not waived; for defects, a security of 3 % of the total interim payments at acceptance is required, typically by standardised Bürgschaft forms.
Subcontracting and Eignungsleihe must be declared via Formblätter 233 and 235, with supporting Verpflichtungserklärungen (Formblatt 236), joint liability for financial capacity used in Eignungsleihe, and a duty to replace unsuitable or excluded third parties.
The employer applies a strict Stammpersonal policy (Formblatt 962EU), requiring at least 70 % of works to be performed by the bidder’s own permanent staff (and similarly for subcontractors) and allowing exclusion or contract termination in the event of false or incomplete declarations.
Additional risks stem from: mandatory Russia-sanctions compliance (Eigenerklärung RUS Sanktion); data protection and IT-security duties, including an obligation to notify SITiF BW of cyber attacks or security incidents; waste management obligations under the Abfall-formblatt (241) making the contractor the waste producer, responsible for proper separation, disposal and documentary evidence under KrWG and NachwV; mandatory electronic invoicing via XRechnung to the central Baden-Württemberg invoice portal; and possible demands for training certificates and authorisations to practise the profession.
The bid validity (Bindefrist) runs until 15.01.2027.
Questions on unclear tender documents must be notified “unverzüglich vor Angebotsabgabe in Textform”; a specific question deadline is not separately stated in the excerpts, so the general duty in 212 EU applies.
No explicit compulsory site visit is mentioned in the excerpt, but weekly site meetings during execution are required.
The documents also address potential contradictions or corrections among themselves and clarify which statements prevail.
Such as, Formblatt 244 states that GAEB Datenaustauschdateien are working tools and that, in case of discrepancies between electronic exchange files and the “schriftliche Fassung” of tender or billing documents, the written version prevails; any content changes relative to the data carrier must be marked in the written document by the contractor.
In apparent tension with this, the “wichtiger Hinweis” declares that, if the Leistungsverzeichnis is submitted both as PDF and GAEB, schriftliche Angebote must be excluded—this does not contradict 244, but narrows the permitted submission mode to electronic via platform in text form with electronic signatures, as confirmed by Formblatt 211 (zugelassene Angebotsabgabe: elektronisch, in Textform, mit Signatur).
Likewise, for security for contract performance, both “verzichtet” and a conditional 5 % obligation for sums ≥ 250,000 € are printed; the marked option “Auf Sicherheit für die Vertragserfüllung wird verzichtet” governs unless the contract sum threshold clause is activated by the contracting authority in the eventual contract.
Only the contracting authority's tender documents are binding. As of: 25/10/2026
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| Lindner AG · Arnstorf | 3 | 2008–2013 |
| Trockenbau München GmbH · Puchheim | 3 | 2006–2010 |
| Linzner GmbH · Röthenbach | 2 | 2009 |
| Gottschild Automatisierungstechnik GmbH · Hofbieber | 2 | 2009–2010 |
| Lauer Industrieservice GmbH · Seeheim-Jugenheim | 2 | 2007–2010 |
How often this buyer tenders this kind of work
Tactics
When this buyer has awarded in this sector, there was usually a single bid in the end. A solid bid has a real chance here. (Based on 87 completed awards — not a statement about this procedure.)
This procedure allows 40 days between publication and deadline — typical in this country is 32 (median of 20,496 procedures). Much more generous than usual — time for a thorough bid rather than a quick one.
Foreign bidders
In Germany · Construction work, 687 contracts went to foreign companies over the last 3 years (of 244,229 recorded awards) — mostly from Austria, France, Poland.
How to bid
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now