How to bid in this country: portals, deadlines, thresholds →
Georgian Buildings Redevelopment Project, Opera Square Development, Limerick
Your path to submission
- Deadline: 13 November at 14:00 — 13 days left.
- You submit on eTenders Ireland — not here and not by e-mail. ↗
- Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
What the buyer is looking for
Tender for Architect-Led Integrated Design Team. Lead consultant and multidisciplinary design team services for the residential redevelopment, refurbishment and adaptation of 9 No. Georgian Buildings and an optional inclusion of a limited restoration/remediation scope for Quins Bar at 9 Ellen Street at the Opera Square Development in Limerick City. The AIDT shall comprise; - Architecture including Conservation Architect, Assigned Certifier, PSDP and any other associated specialist design services required by the Scope of Services as per Schedule B - Civil and Structural Engineering - Mechanical/ Plant Engineering, - Electrical Engineering - Fire / DAC Consultancy Services The procurement is for a single coordinated AIDT Tender. Following award, LTT will enter into individual appointments under the Standard Conditions of Engagement (COE 1) and associated schedules with each of the core…
Show full description
… Principal Service Providers comprising the AIDT. The Architect shall act as AIDT Lead / Team Leader and lead designer. A Quantity Surveyor and Planning Consultant (if required) will be appointed separately by LTT and do not form part of the AIDT.
Contract
Type of service
Clement What the numbers say about this buyer
- The median procedure drew 5 bids (8 procedures with a bid count); 0% ended with a single bidder. Sector: median 6 bids.n = 8
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 25/10/2026.
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| John Sisk and Son (Holdings) Ltd | 2 | 2020 |
| Jones Lang LaSalle JLL | 2 | 2024–2025 |
| Martins Construction Ltd | 1 | 2023 |
| Teneo Strategy Ireland Limited | 1 | 2020 |
| MF Modular Engineering Limited | 1 | 2024 |
How often this buyer tenders this kind of work
Tactics
When contracts were awarded in this country and sector, usually 6 or more bids came in. Many compete here — price and references decide. (Based on 7,792 completed awards — not a statement about this procedure.)
This procedure allows 35 days between publication and deadline — typical in this country is 31 (median of 863 procedures). A normal window for this market.
Foreign bidders
In Ireland · Architecture & engineering, 396 contracts went to foreign companies over the last 3 years (of 8,485 recorded awards) — mostly from United Kingdom, Spain, France.
How to bid
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now