DYNAMIC PURCHASING SYSTEM FOR RECREATION TRAIL CONSTRUCTION AND MAINTENANCE SERVICES 2023 - 2028 PRE-QUALIFICATION QUESTIONNAIRE
Ireland · how to bid here →
Your path to submission
- Deadline: 3 August 2027 at 12:00 — 303 days left.
- You submit on eTenders Ireland — not here and not by e-mail. ↗
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- 8% of this buyer's awards went to companies that had already won here before (27 awards since 2014, spread over 13 companies). That is well below the sector norm (37%) — this buyer switches suppliers more often than others.n = 27 awards since 2014
- The median procedure drew 4 bids (25 procedures with a bid count); 16% ended with a single bidder. Sector: median 6 bids.n = 25
- 15% of awards went to companies from abroad (27 awards with a known winner country). Sector average: 5%.n = 27
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Ireland · Architecture & engineering, 381 contracts went to foreign companies over the last 3 years (of 8,385 recorded awards) — mostly from United Kingdom, Spain, France.
Typical field: median 6 (from 7,734 awards).
What the buyer is looking for
DYNAMIC PURCHASING SYSTEM FOR RECREATION TRAIL CONSTRUCTION AND MAINTENANCE SERVICES 2023 - 2028 PRE-QUALIFICATION QUESTIONNAIRE Recreation Trail and Infrastructure Construction and Maintenance Contracts will involve the supply of suitable machine/plant hire, with driver, for general civil engineering operations, there is also a requirement for manual work elements. Tasks involved may include but are not limited to the following: 1) The construction of new recreation trails including but not limited to; walking, equestrian, multi-access and family friendly cycling trails. 2) Upgrading of existing recreation sites and recreation trails including but not limited to; walking, equestrian, multi-access, family friendly cycling trails and mountain bike trails. 3) Maintenance of existing and new recreation sites and recreation trails including but not limited to; walking, equestrian,…
Show full description
… multi-access, family friendly cycling trails and mountain bike trails. 4) Preventative trail repair/upgrade in particular but not limited to water management and resurfacing. 5) Surveying where relevant. 6) Culvert and pipe installation. 7) Special construction works to include: bridges, kissing gates, bog bridges, board walks etc. 8) Construction of carparks unbound and bound. 9) Upgrade of car-parking facilities - unbound and bound. 10) Traffic management works in carparks e.g. ramps, bollards etc. 11) Fencing of recreation sites (handrails where applicable) 12) Stone wall work at recreation sites where relevant. 13) Supply and/or installation of recreation furniture e.g., benches, picnic tables. 14) Installation of recreation signage e.g., trail heads, threshold signage, way-mark route markers, advisory signage etc. 15) Installation of natural play areas. 16) Erection of wildlife measures e.g. bat boxes and Owl boxes where relevant.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Taylor McCarney Architects | 2 | 2024 |
| Certa Ireland Ltd | 2 | 2025–2026 |
| KILCOYNE TREE SURGERY Ltd | 1 | 2014 |
| K W Landscaping | 1 | 2014 |
| KOREC | 1 | 2020 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.