Design, fabrication and delivery of specific lighting bowl fixtures
Conception, fabrication et livraison de vasques de luminaires spécifiques
France · LYON · how to bid here →
Your path to submission
- Deadline: 22 October at 09:00 — 18 days left.
- The submission point is stated in the notice (link on the right). Submission via the buyer profile named in the notice (e.g. PLACE/Maximilien): free account required; a signature is usually only demanded from the winning bidder. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (6 awards, most recently July 2026) — the next award is due around October 2026 by that rhythm. The last award went to NOVELTY AUVERGNE-RHONE-ALPES.n = 6
- The award came in at a median 111% of the estimated value (196 awards with both estimate and value) — pricing at the estimate is usually too low here. Sector: 56%.n = 196
- 0% of the bids received came from other countries (93 procedures with a bid mix) — all bidders, not just the winners. Sector: 29%.n = 93
- 98% of the bids received came from small and medium-sized enterprises (93 procedures with a bid mix). Sector: 41%.n = 93
- 33% of this buyer's awards went to companies that had already won here before (3,799 awards since 2015, spread over 1,664 companies). 67% went to new names.n = 3,799 awards since 2015
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In France · Electrical machinery, 153 contracts went to foreign companies over the last 3 years (of 1,496 recorded awards) — mostly from Germany, Italy, Spain.
Typical field: median 1 (from 6 awards).
What the buyer is looking for
The City of Lyon wishes to be able to replace deteriorated basins whose marketing has been stopped by the manufacturer. This replacement is carried out with the objective of reusing the other components of the luminaire while maintaining the initial photometric qualities. The duration of the framework agreement is 4 years, without minimum order and with a maximum order of 120 000 euro(s) excluding VAT. The framework agreement will be awarded to several operators, up to a maximum number of 2
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| RABY | 26 | 2015–2022 |
| SPIE FACILITIES | 23 | 2017–2026 |
| RABY SAS | 23 | 2015–2020 |
| QUALICONSULT | 20 | 2015–2025 |
| LES MENUISIERS DU RHONE | 14 | 2015–2020 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on PLACE — Plateforme des achats de l'État (Frankreich) → Registration, signature, fees — from the operator's bidder manual.