Framework agreement for the supply and delivery of electricity, natural gas and associated services
Accord-cadre relatif à la fourniture et à l'acheminement en électricité, en gaz naturel et services associés
France · Dept. 83 · how to bid here →
Your path to submission
- Deadline: 20 October at 13:00 — 16 days left.
- The submission point is stated in the notice (link on the right). Submission via the buyer profile named in the notice (e.g. PLACE/Maximilien): free account required; a signature is usually only demanded from the winning bidder. Sort out account and signature first — not on submission day.
- Offer and evidence in: FRA, FRA.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- 15% of this buyer's awards went to companies that had already won here before (163 awards since 2021, spread over 59 companies). 85% went to new names.n = 163 awards since 2021
- The median procedure drew 2 bids (121 procedures with a bid count); 17% ended with a single bidder. Sector: median 3 bids.n = 121
- The award came in at a median 62% of the estimated value (5 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 56%.n = 5
- Across 3 procedures with structured selection criteria, this buyer most often required: References: services (3 of 3), Staff qualifications (3 of 3), Professional liability insurance (3 of 3), Minimum turnover in the contract field (3 of 3).n = 3
- 11% of awards went to companies from abroad (163 awards with a known winner country). Sector average: 12%.n = 163
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In France · Electrical machinery, 153 contracts went to foreign companies over the last 3 years (of 1,496 recorded awards) — mostly from Germany, Italy, Spain.
Typical field: median 3 (from 1,292 awards).
What the buyer is looking for
Performance of the services shall start from the date of notification of the contract. A retention money guarantee is provided for in the contract. It can be replaced by a first demand guarantee. An advance shall be granted to the holder. The payment of the services will be made in compliance with the overall payment deadline applicable to the buyer. Contracts financed by the Communities' own resources
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in French.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| ENT GEN TRAVAUX ELECTRIQUE SERRADORI CIE | 4 | 2022–2025 |
| CITEMETRIE SAS | 3 | 2024–2025 |
| PROPOLYS | 3 | 2024–2025 |
| NORD ENGINEERING FRANCE | 3 | 2022–2026 |
| UTPM ENVIRONNEMENT | 3 | 2022–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on PLACE — Plateforme des achats de l'État (Frankreich) → Registration, signature, fees — from the operator's bidder manual.