Friedrich & ClementBETA

Redevelopment of the Chastel-Nouvel site - Lot 2 electricity

Réaménagement du site du Chastel-Nouvel - Lot 2 électricité

France · Dept. 48 · how to bid here

Your path to submission

  1. Deadline: 1 October at 12:00 — 15 days left.
  2. The submission point is stated in the notice (link on the right). Submission via the buyer profile named in the notice (e.g. PLACE/Maximilien): free account required; a signature is usually only demanded from the winning bidder. Sort out account and signature first — not on submission day.
  3. Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

Clement What the numbers say about this buyer

  • 20% of this buyer's awards went to companies that had already won here before (330 awards since 2018, spread over 113 companies). 80% went to new names.n = 330 awards since 2018
  • The award came in at a median 84% of the estimated value (5 awards with both estimate and value) — pricing at the estimate is usually too high here. Country: 67%.n = 5
  • The median procedure drew 4 bids (293 procedures with a bid count); 10% ended with a single bidder. Country: median 3.6 bids.n = 293
  • 4% of awards went to companies from abroad (330 awards with a known winner country). National average: 10%.n = 330
  • Across 4 procedures with structured selection criteria, this buyer most often required: Minimum turnover in the contract field (4 of 4), References: services (3 of 4), Minimum annual headcount (3 of 4), Equipment, plant and technical facilities (1 of 4).n = 4

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 13/09/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.
Too big for you alone? Consortium or reliance on capacity: a partner's references and turnover count (Art. 63 Dir. 2014/24) — cross-border too.

Foreign bidders

In France, 48,867 contracts went to foreign companies over the last 3 years (of 843,361 recorded awards) — mostly from Germany, Spain, Italy.

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

Contract

BuyerDépartement de la Lozère
TypeWorks
Estimated valuenot published — common for below-threshold procedures
Published15 September 2026

Who has won here before

CompanyAwardsPeriod
SOMATRA42025
PUBLIC IMPRIM42025
SARL GARAGE SOLIGNAC42024–2026
PAGES SAS32024–2025
OC'TEHA32024–2025
From 13.7M documented awards · regular winners know this buyer's requirements — that is your competition.
·
days until the deadlineThursday 1 October at 12:00

How to bid

Guide: how to apply on PLACE — Plateforme des achats de l'État (Frankreich) → Registration, signature, fees — from the operator's bidder manual.

Open BOAMP / profil d'acheteur and search there for:
Réaménagement du site du Chastel-Nouvel - Lot 2 électricité
We hold no notice number for this source — search by title or buyer.
Tenders like this, every morning at 7:30 in your inbox.
Register now →