Friedrich & ClementBETA

Modeling and design study for the new protective structures of the Port of Sainte Marie

étude de modélisation et de conception pour l'aménagement des nouveaux ouvrages de protection du port de Sainte Marie

France · SAINTE MARIE LA MER · how to bid here →

Your path to submission

  1. Deadline: 8 October at 19:00 — 5 days left.
  2. The submission point is stated in the notice (link on the right). Submission via the buyer profile named in the notice (e.g. PLACE/Maximilien): free account required; a signature is usually only demanded from the winning bidder. Sort out account and signature first — not on submission day.
  3. Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

Clement What the numbers say about this buyer

  • The median procedure drew 9 bids (14 procedures with a bid count); 29% ended with a single bidder. Sector: median 5 bids.n = 14
  • 29% of this buyer's awards went to companies that had already won here before (25 awards since 2017, spread over 15 companies). 71% went to new names.n = 25 awards since 2017
  • 8% of awards went to companies from abroad (25 awards with a known winner country). Sector average: 7%.n = 25

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 27/09/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.
Anything unclear? Bidder questions are your right — ask in writing, the answer goes to everyone.

Foreign bidders

In France · IT services, 224 contracts went to foreign companies over the last 3 years (of 4,597 recorded awards) — mostly from Germany, Spain, Belgium.

Typical field: median 5 (from 3,909 awards).

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

What the buyer is looking for

The summary in English is being prepared. The official description below is in the original language (FR).

Show original description (FR)

étude de modélisation et de conception pour l'aménagement des nouveaux ouvrages de protection du port de Sainte Marie

Description as published (FR).

Contract

BuyerCommune de Sainte-Marie- la-Mer
TypeServices
Estimated value100.000 €
Published7 July 2026
CategoryIT services · CPV 72242000

Who has won here before

CompanyAwardsPeriod
SARRE ET MOSELLE22024
CNP ASSURANCES22024
SMACL ASSURANCES22024
AURA COURTAGE22024
TRAVAUX PUBLICS 6622025
From 18.0M documented awards · regular winners know this buyer's requirements — that is your competition.
·
days until the deadline — Thursday 8 October at 19:00

How to bid

Guide: how to apply on PLACE — Plateforme des achats de l'État (Frankreich) → Registration, signature, fees — from the operator's bidder manual.

Read the full notice — Original + documents
Goes directly to this tender on BOAMP / profil d'acheteur. The full specification and all annexes are there.

Tender documents — direct download

Specifications and annexes hosted by the buyer — usually accessible without registration.
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now →
Modeling and design study for the new protective structures of the Por — Friedrich & Clement