Replacement Canal Operating Path at Nord-Ostsee-Kanal Section Breiholz Kkm 49,950 to Am Moltkestein Kkm 54,900 North Side
Ersatz Kanalbetriebsweg am Nord-Ostsee-Kanal Streckenabschnitt Breiholz Kkm 49,950 bis Am Moltkestein Kkm 54,900 Nordseite
Germany · Kiel · how to bid here →
Your path to submission
- Deadline: 21 October at 10:15 — 18 days left.
- You submit on e-Vergabe des Bundes — not here and not by e-mail. ↗
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- 32% of this buyer's awards went to companies that had already won here before (32 awards since 2021, spread over 22 companies). That is well below the national norm (45%) — this buyer switches suppliers more often than others.n = 32 awards since 2021
- The median procedure drew 2 bids (31 procedures with a bid count); 48% ended with a single bidder. Country: median 3.1 bids.n = 31
- Across 4 procedures with structured selection criteria, this buyer most often required: References: works (2 of 4), Equipment, plant and technical facilities (1 of 4), References: supplies (1 of 4), Professional liability insurance (1 of 4).n = 4
- Not one of the 32 awards with a known winner country has gone to a foreign company so far. National average: 1%.n = 32
- From notice to award takes a median 97 days here (5 procedures). Country: 91 days.n = 5
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 27/09/2026.
Foreign bidders
In Germany, 5,912 contracts went to foreign companies over the last 3 years (of 715,406 recorded awards) — mostly from Austria, Poland, Italy.
What the buyer is looking for
Renewal of an approximately 5.0 km long canal operating route on the Kiel Canal. The following work shall be carried out: Concrete track slabs and concrete blocks can be picked up and recycled to remove topsoil, carry out soil analyses according to LAGA 2004, drive off and dispose of obstructions Steel bollards with concrete-filled headboard remove soil for rough planum, temporarily store and partially run off Distribute detached soil on the waterside side surface and cover cable trenches create cable protection pipes for later occupation professionally install cable ducts professionally fill cable trenches and profiling and compacting planum If necessary, install gravel compensation layer Geotextile mats provide frost protection gravel and supply profile-appropriately installed concrete recycling material as a load-bearing layer and professionally install in situ concrete tracks in 15…
Show full description
… cm thickness Concrete-solidated traces and manufacture secondary surfaces with protective film after treatment clay gravel gravel gravel for side areas and supply concrete recycling material as a supporting layer and supply professionally installed in situation strips and, if necessary, produce a shaving strips for grass pavements and pavements.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Adler-Schiffe GmbH und Co. KG · Sylt | 3 | 2025 |
| NK Stahlwasserbau GmbH&Co.KG · Büddelsdorf | 3 | 2025 |
| ARGE Hochdonn 1 BA | 3 | 2025–2026 |
| LPI Ingenieurgesellschaft mbH · Hannover | 3 | 2025 |
| KWS GmbH & Co. | 2 | 2025 |
How to bid
Guide: how to apply on e-Vergabe des Bundes (evergabe-online.de) → Registration, signature, fees — from the operator's bidder manual.