“Construction of a photovoltaic power plant for own consumption and partial air-conditioning of the building Chitalishte “St. St. Cyril and Methodius 1894” in Topolovgrad”

„Изграждане на фотоволтаична централа за собствено потребление и частична климатизация на сграда Читалище „Св. Св. Кирил и Методий 1894“ в гр. Тополовград“ — original title

BGBulgariaBELOW THRESHOLD — NOT ON TED

Your path to submission

  1. Deadline: 16 November at 23:59 — 16 days left.
  2. You submit on ЦАИС ЕОП — not here and not by e-mail. ↗
  3. Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

What the buyer is looking for

Requirements for materials used in the construction The delivery of all products, materials and equipment necessary for the execution of the construction and installation works is the responsibility of the Contractor. All materials and construction products / products should be new, free from defects, within the shelf life for use in construction, accompanied by the relevant documents certifying the origin, characteristics and use of the product. Only construction products which have suitable characteristics for incorporation, installation, placement or installation on the site and only those which comply with the relevant technical rules, norms and regulations should be supplied and incorporated on site. Materials which do not comply with the requirements set out in the technical specification and/or which are unfit, damaged or contaminated may not be incorporated into the site and…

Show full description

… shall be replaced by new, compliant materials at the expense of the Contractor. All materials and equipment used by the Contractor in construction should be used and stored in a manner that ensures protection against injury and accidents. All building materials used must meet the requirements of Bulgarian and/or European standards. The products and materials to be placed on the site must have assessed compliance with the essential requirements set out in the regulations under Article 7 of the Technical Requirements for Products Act and be accompanied by documents (test reports, quality certificates, declarations of conformity, warranty cards, technical requirements for operation, etc.) certifying their compliance with the requirements of existing regulatory documents. All construction products used must comply with European technical specifications, must bear the CE marking of conformity, accompanied by an EC declaration of conformity and guidelines for application

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

TypeWorks
Estimated value€207,349
Published26 Oct 2026
ProcedureПублично състезание

Type of service

45 · Construction work
CPV 45315600

Clement What the numbers say about this buyer

  • In this sector the buyer awards roughly every month (35 awards, most recently September 2026) — by that rhythm the next award was due around October 2026. The last award went to УЛТРА БИЛД ООД.n = 35
  • The award came in at a median 77% of the estimated value (22 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 98%.n = 22
  • 63% of this buyer's awards went to companies that had already won here before (162 awards since 2018, spread over 48 companies). 37% went to new names.n = 162 awards since 2018
  • The median procedure drew 2 bids (138 procedures with a bid count); 34% ended with a single bidder. Sector: median 2 bids.n = 138
  • 0% of the bids received came from small and medium-sized enterprises (40 procedures with a bid mix). Sector: 17%.n = 40

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.

Clement
In this buyer's last 25 comparable contracts (same sector), usually only a single offer came in — a solid bid has real chances.
References and certificates from your home country count fully across the EU — that is what European procurement law is for.

Who has won at this buyer so far

Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.

CompanyAwardsPeriod
ВЕДИПЕМА ЕООД142025–2026
ЕКО СТРОЙ ПРОЕКТ ЕООД142024–2026
Мах Консулт ЕООД112024–2026
УЛТРА БИЛД ООД92020–2026
БКС ООД92020–2026
From the recorded awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this kind of work

23
2024
30
2025
23
2026
76 procedures in this category since 2019. Public procurement repeats itself — those who know the rhythm prepare instead of reacting.
·
Deadline — Monday 16 November at 23:59

Tactics

When this buyer has awarded in this sector, there was usually a single bid in the end. A solid bid has a real chance here. (Based on 25 completed awards — not a statement about this procedure.)

This procedure allows 22 days between publication and deadline — typical in this country is 30 (median of 1,862 procedures). A normal window for this market.

The deadline falls on a Monday — your last full working day is the Friday before. Have evidence and guarantees together by Thursday.

Foreign bidders

In Bulgaria · Construction work, 16 contracts went to foreign companies over the last 3 years (of 20,655 recorded awards).

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

How to bid

Read the full notice — Original + documents
Goes directly to this tender on ЦАИС ЕОП. The full specification and all annexes are there.
Put together the evidence
Certificates, references and your price — as set out in the notice.
Submit via ЦАИС ЕОП before the deadline
Electronic submission — allow time for the portal registration the first time.
To the procurement portal →
We pull data from millions of notices. If the link here does not work, report it — we will find the right one.

Don't miss the next one

Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.

Register now