Friedrich & ClementBETA

How to bid in this country: portals, deadlines, thresholds →

Production and delivery of powder fuel system FOR steam generator No. 7 – according to technical specifications and drawings

Изработка и доставка на прахова горивна уредба за парогенератор №7 – по техническо задание и чертежи — original title

BGBulgariaBELOW THRESHOLD — NOT ON TED

Your path to submission

  1. Deadline: 16 November at 23:59 — 16 days left.
  2. You submit on ЦАИС ЕОП — not here and not by e-mail. ↗
  3. Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

What the buyer is looking for

In connection with the planned repair of steam generator No7 in 2027. for the needs of Toplofikatsia Ruse AD, it is necessary to produce a new dust fuel system. The order includes production and delivery of the following components of powder fuel system, made according to the terms of reference and attached drawings: "Flank burner 1" - 2 pieces "Flank box 1" - 2 pieces "Flank burner 2" - 2 pieces "Flank box 2" - 2 pieces "Air duct with flaps - 4 pieces The materials for making the burners are provided by the contractor, all details to be made of steel brands specified in the relevant drawings and specifications.

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

TypeSupplies
Estimated value€105,000
Published23 Oct 2026
ProcedureПублично състезание

Type of service

31 · Electrical machinery
CPV 31161700

Clement What the numbers say about this buyer

  • In this sector the buyer awards roughly every 4 months (8 awards, most recently July 2025) — by that rhythm the next award was due around November 2025. The last award went to ДАЛСИЯ ООД.n = 8
  • 60% of this buyer's awards went to companies that had already won here before (136 awards since 2022, spread over 52 companies). That is well below the sector norm (80%) — this buyer switches suppliers more often than others.n = 136 awards since 2022
  • The median procedure drew 2 bids (94 procedures with a bid count); 29% ended with a single bidder. Sector: median 3 bids.n = 94
  • The award came in at a median 80% of the estimated value (10 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 81%.n = 10
  • 2% of awards went to companies from abroad (136 awards with a known winner country). Sector average: 0%.n = 136

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.

Clement
In this buyer's last 6 comparable contracts (same sector), usually only a single offer came in — a solid bid has real chances.
References and certificates from your home country count fully across the EU — that is what European procurement law is for.

Who has won at this buyer so far

Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.

CompanyAwardsPeriod
ПЕЩОСТРОЕНЕ И ИЗОЛАЦИИ - СВИЩОВ ЕООД92024
ЕНЕРГОРЕМОНТ - ГЪЛЪБОВО АД82024–2025
ДАЛСИЯ ООД72024–2026
КИМТЕХ-БЪЛГАРИЯ ООД72024
МЕТАЛ ГРУП ЕЛИТ 2006 ЕООД72024–2026
From the recorded awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this kind of work

9
2024
4
2025
1
2026
14 procedures in this category since 2019. Public procurement repeats itself — those who know the rhythm prepare instead of reacting.
·
Deadline — Monday 16 November at 23:59

Tactics

When this buyer has awarded in this sector, there was usually a single bid in the end. A solid bid has a real chance here. (Based on 6 completed awards — not a statement about this procedure.)

This procedure allows 25 days between publication and deadline — typical in this country is 30 (median of 1,862 procedures). A normal window for this market.

The deadline falls on a Monday — your last full working day is the Friday before. Have evidence and guarantees together by Thursday.

Foreign bidders

In Bulgaria · Electrical machinery, 1 contract went to a foreign company over the last 3 years (of 2,414 recorded awards).

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

How to bid

Read the full notice — Original + documents
Goes directly to this tender on ЦАИС ЕОП. The full specification and all annexes are there.
Put together the evidence
Certificates, references and your price — as set out in the notice.
Submit via ЦАИС ЕОП before the deadline
Electronic submission — allow time for the portal registration the first time.
To the procurement portal →
We pull data from millions of notices. If the link here does not work, report it — we will find the right one.

Don't miss the next one

Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.

Register now