Friedrich & ClementBETA

How to bid in this country: portals, deadlines, thresholds →

“Main renovation of the site: “Yard space of Kindergarten in UPI XXXII, district 22, for a unified kindergarten, Lyubimets”, Municipality of Lyubimets, District Haskovo”

„Основен ремонт на обект: „Дворно пространство на Детска ясла в УПИ XXXII, кв. 22, за обединено детско заведение, гр. Любимец“, Община Любимец, Област Хасково“ — original title

BGBulgariaBELOW THRESHOLD — NOT ON TED

Your path to submission

  1. Deadline: 2 November at 23:59 — 2 days left.
  2. You submit on ЦАИС ЕОП — not here and not by e-mail. ↗
  3. Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

What the buyer is looking for

The planned activities include dismantling existing facilities, breaking down old pavements and foundations, loading and transporting construction waste and land masses up to 5 km. Earthworks and vertical planning will be carried out, including excavation, removal of excess land masses, supply and laying of suitable soils for alignment of the terrain, as well as compaction of the embankments and preparation of the foundation for the new pavements. It is planned to build external pavements by laying and compacting mineral fractions, sand base and earth-moist cement sand mortar, followed by laying paving slabs. Subjected concrete and installation of visible garden curbs will be performed. For the separate play areas is provided execution of reinforced concrete base of concrete class C20/25, laying of reinforcing mesh and laying of anti-shock rubberized flooring. The scope of the contract also includes the execution of formwork, reinforcement and concrete foundation for arbor foundation, etc.

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

TypeWorks
Estimated value€102,353
Published22 Oct 2026
ProcedureСъбиране на оферти с обява

Type of service

45 · Construction work
CPV 45000000

Clement What the numbers say about this buyer

  • In this sector the buyer awards roughly every 2 months (21 awards, most recently June 2026) — by that rhythm the next award was due around August 2026. The last award went to АКВА-3 ООД.n = 21
  • 61% of this buyer's awards went to companies that had already won here before (78 awards since 2018, spread over 23 companies). 39% went to new names.n = 78 awards since 2018
  • The median procedure drew just one bid (63 procedures with a bid count); 52% ended with a single bidder. Sector: median 2 bids.n = 63
  • The award came in at a median 88% of the estimated value (6 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 98%.n = 6
  • 0% of the bids received came from small and medium-sized enterprises (8 procedures with a bid mix). Sector: 17%.n = 8

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 25/10/2026.

Clement
In this buyer's last 13 comparable contracts (same sector), usually only 2 offers came in — a solid bid has real chances.
References and certificates from your home country count fully across the EU — that is what European procurement law is for.

Who has won at this buyer so far

Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.

CompanyAwardsPeriod
ЕВРОПЪТ 2005 ООД122018–2026
АКВА-3 ООД82023–2026
ВОЛАН-05 ООД82020–2026
СП-90 ООД82022–2026
ЖАНЕТ СВИЛЕНГРАД ООД72019–2026
From the recorded awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this kind of work

21
2024
6
2025
14
2026
41 procedures in this category since 2019. Public procurement repeats itself — those who know the rhythm prepare instead of reacting.
·
Deadline — Monday 2 November at 23:59

Tactics

When this buyer has awarded in this sector, usually only one or two bids came in. A solid bid has a real chance here. (Based on 13 completed awards — not a statement about this procedure.)

This procedure allows 11 days between publication and deadline — typical in this country is 30 (median of 1,785 procedures). Much tighter than usual: the first week counts.

The deadline falls on a Monday — your last full working day is the Friday before. Have evidence and guarantees together by Thursday.

Foreign bidders

In Bulgaria · Construction work, 16 contracts went to foreign companies over the last 3 years (of 20,631 recorded awards).

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

How to bid

Read the full notice — Original + documents
Goes directly to this tender on ЦАИС ЕОП. The full specification and all annexes are there.
Put together the evidence
Certificates, references and your price — as set out in the notice.
Submit via ЦАИС ЕОП before the deadline
Electronic submission — allow time for the portal registration the first time.
To the procurement portal →
We pull data from millions of notices. If the link here does not work, report it — we will find the right one.

Don't miss the next one

Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.

Register now