Friedrich & ClementBETA

How to bid in this country: portals, deadlines, thresholds →

Engineering – design, execution of construction and installation works and exercise of author's supervision for the object: "Execution of an extension (elevator), reconstruction and major repair for implementation of energy efficiency measures of the building of 67 Secondary School "Vasil Drumev" in UPI I – for school, quarter 31, plot "NPZ Sredets", CONTINUATION IN OBJECTIVE SECTION - ADDITIONAL INFORMATION

„Инженеринг – проектиране, изпълнение на СМР и упражняване на авторски надзор за обект: „Изпълнение на пристройка (асансьор), преустройство и основен ремонт за въвеждане на мерки за енергийна ефективност на сградата на 67 ОУ „Васил Друмев“ в УПИ I – за училище, кв. 31, м. „НПЗ Средец“, ПРОДЪЛЖЕНИЕ В РАЗДЕЛ ЦЕЛ - ДОПЪЛНИТЕЛНА ИНФОРМАЦИЯ — original title

BGBulgaria

Your path to submission

  1. Deadline: 5 November at 23:59 — 5 days left. The buyer has extended the deadline — previously 21 October.
  2. You submit on ЦАИС ЕОП — not here and not by e-mail. ↗
  3. Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

What the buyer is looking for

The subject matter of this contract is ‘Engineering – design, execution of construction and installation works and author’s supervision of a site: ‘Implementation of an extension (elevator), reconstruction and overhaul for the introduction of energy efficiency measures for the building of 67 Vasil Drumev Primary School in Regulated Area I – for a school, district 31, m. NPZ Sredets, land with ID 68134.305.123, building with ID 68134.305.123.1, with administrative address: Sofia, Sofia, Vazrazhdane District, № 63 Gyueshevo Str., in accordance with the regulations in force. The main objective of the contract is to raise the energy consumption class of the building under intervention by achieving a class B of energy consumption, thermal comfort and higher quality of living environment through the implementation of the project’s activities. Specific objectives: - Improving the energy…

Show full description

… performance of a building by implementing high-efficiency energy measures; - Improvement of the internal microclimate, thermal comfort and operating conditions; - Improve performance to extend the life cycle of the building; - Reducing energy consumption costs. According to the prepared energy audit report and energy performance certificate of the building, the following measures should be envisaged in the project: Energy saving measure B1: Thermal insulation of external walls; Energy saving measure B2: Replacement of external windows; Energy saving measure B3: Thermal insulation of the roof; Energy saving measure B4: Thermal insulation of the floor; Energy saving measure C1: Energy-saving measure for replacement of radiators and piping; Energy saving measure C2: Measures on lighting systems. The subject matter of this contract covers the following activities: Stage I: Design – Preparation of an investment project in the ‘working project’ phase, in accordance with Regulation № 4 of 21 May 2001 on the scope and content of investment projects, the Spatial Development Act and the secondary legislation

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

TypeWorks
Estimated value€6,266,667
Published22 Sept 2026
ProcedureОткрита процедура

Type of service

45 · Construction work
CPV 45214200

Clement What the numbers say about this buyer

  • In this sector the buyer awards roughly every 2 months (47 awards, most recently August 2026) — by that rhythm the next award was due around October 2026. The last award went to ДАРВИ ЕООД.n = 47
  • 50% of this buyer's awards went to companies that had already won here before (91 awards since 2022, spread over 46 companies). That is well below the sector norm (62%) — this buyer switches suppliers more often than others.n = 91 awards since 2022
  • The median procedure drew 2 bids (85 procedures with a bid count); 36% ended with a single bidder. Sector: median 2 bids.n = 85
  • 0% of the bids received came from small and medium-sized enterprises (26 procedures with a bid mix). Sector: 17%.n = 26
  • The award came in at a median 99% of the estimated value (13 awards with both estimate and value) — pricing at the estimate is usually about right here. Sector: 98%.n = 13

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.

Clement
In this buyer's last 47 comparable contracts (same sector), usually only 2 offers came in — a solid bid has real chances.
References and certificates from your home country count fully across the EU — that is what European procurement law is for.

Part of a larger project

„Инженеринг – проектиране
The same buyer is tendering this project in several lots.
  1. изпълнение на СМР и упражняване на авторски надзор за обект: „Изпълнение на пристройка (асансьор), преустройство и основен ремонт за въвеждане на мерки за енергийна ефективност на сградата на 67 ОУ „Васил Друмев“ в УПИ I – за училище, кв. 31, м. „НПЗ Средец“, ПРОДЪЛЖЕНИЕ В РАЗДЕЛ ЦЕЛ - ДОПЪЛНИТЕЛНА ИНФОРМАЦИЯDeadline 5 Novthis lot
  2. изпълнение на СМР и упражняване на авторски надзор за обект: „Изпълнение на пристройка (асансьор)Deadline 5 Nov
  3. изпълнение на СМР и упражняване на авторски надзор за обект: „ДЕТСКИЯТ ПАРК“Deadline 19 Nov
The deadlines differ — if you offer several trades you can work through them one after another. Matched by buyer and the start of the title; differently named lots may be missing.

Who has won at this buyer so far

Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.

CompanyAwardsPeriod
БУЛСТРОЙ ГРУП ЕООД62025–2026
СТИЛ ИНЖЕНЕРИНГ 2010 ЕООД62024–2025
ЕнЕф Консултанти ЕООД52025–2026
ЛЕГО ТРЕЙД ЕООД42024
ПОЛИТРЕЙД КЪНСТРЪКШЪН ЕООД42024–2025
From the recorded awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this kind of work

23
2024
51
2025
24
2026
98 procedures in this category since 2019. Public procurement repeats itself — those who know the rhythm prepare instead of reacting.
·
Deadline — Thursday 5 November at 23:59

Tactics

When this buyer has awarded in this sector, usually only one or two bids came in. A solid bid has a real chance here. (Based on 47 completed awards — not a statement about this procedure.)

This procedure allows 45 days between publication and deadline — typical in this country is 30 (median of 1,862 procedures). Much more generous than usual — time for a thorough bid rather than a quick one.

Foreign bidders

In Bulgaria · Construction work, 16 contracts went to foreign companies over the last 3 years (of 20,655 recorded awards).

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

How to bid

Read the full notice — Original + documents
Goes directly to this tender on ЦАИС ЕОП. The full specification and all annexes are there.
Put together the evidence
Certificates, references and your price — as set out in the notice.
Submit via ЦАИС ЕОП before the deadline
Electronic submission — allow time for the portal registration the first time.
To the procurement portal →
We pull data from millions of notices. If the link here does not work, report it — we will find the right one.

Don't miss the next one

Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.

Register now