How to bid in this country: portals, deadlines, thresholds →
Renewal of the drive system and control technology of the AAS
Erneuerung des Antriebsystems und der Steuerungstechnik der AAS — original title
Your path to submission
- Deadline: 9 November at 10:00 — 8 days left.
- The submission point is stated in the notice (link on this page).
- Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
What the buyer is looking for
The existing PLC control (Simatic S7-300 + Profibus) /PLC control of the shredder system (rotor ripper CR 237-15, in operation since 2007) as well as the hydraulic drive unit must be dismantled, renewed and modernized. Deliverable: Modernization of the control system and the hydraulic drive system of the shredder system / rotor tearer CR 237-15) at the location Gradestraße 81, 12347 Berlin consisting of: - planning, delivery, assembly, programming and commissioning of a new PLC/PLC control system with all necessary safety and control components, - disassembly and disposal of the previous control system (SIMATIC S7-300 + Profibus, MP 370 control panel, control cards, control cabinets, etc.), - Dismantling and disposal of the old drive systems - supply and installation of the hydraulic drive unit DUc or an equivalent unit (hydraulic drive with direct coupled hydraulic motors Hägglunds), -…
Show full description
… integration of the new control system and the new drive unit into the existing plant concept without loss of power and without fundamental changes to the plant process, - Minimization of the maintenance effort of the new drive unit. Renewal of the drive system and control technology of the AAS
Contract
Type of service
Tender documents — direct download
How often this buyer tenders this kind of work
Contracting authority contact
Tactics
When contracts were awarded in this country and sector, usually about 3 bids came in. A normal field for this market. (Based on 230,099 completed awards — not a statement about this procedure.)
This procedure allows 24 days between publication and deadline — typical in this country is 32 (median of 20,496 procedures). Much tighter than usual: the first week counts.
The deadline falls on a Monday — your last full working day is the Friday before. Have evidence and guarantees together by Thursday.
Foreign bidders
In Germany · Construction work, 687 contracts went to foreign companies over the last 3 years (of 244,229 recorded awards) — mostly from Austria, France, Poland.
How to bid
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now