How to bid in this country: portals, deadlines, thresholds →
Construction of new Regional School Gingst, 1st construction phase, Lot 16 Construction cleaning
Neubau Regionale Schule Gingst, 1. Bauabschnitt, Los 16 Baureinigung — original title
Your path to submission
- Deadline: 2 November at 10:00 — 1 day left.
- You submit on Vergabemarktplatz (cosinex) — not here and not by e-mail. ↗ Free bidder account on the cosinex platform required (created instantly); offers go through the bidding tool, usually plain text form suffices — no qualified signature. Sort out account and signature first — not on submission day.
- Offer and evidence in: German.
- Collect your evidence — use the eligibility analysis on this page: it lists the requirements and, for known certificates, how to get them.
What the buyer is looking for
The summary in English is being prepared. The official description below is in the original language (DE).
Show original description (DE)
Die Projektbeschreibung ist dem beigefügten Leistungsverzeichnis zu entnehmen (Vorbemerkung/ Baubeschreibung). · Siehe Leistungsverzeichnis
Contract
Type of service
Clement What the numbers say about this buyer
- 76% of this buyer's awards went to companies that had already won here before (18 awards since 2024, spread over 5 companies). That is well above the sector norm (49%) — newcomers have a harder time here than elsewhere.n = 18 awards since 2024
- The median procedure drew 2 bids (18 procedures with a bid count); 33% ended with a single bidder. Sector: median 4 bids.n = 18
- 100% of the bids received came from small and medium-sized enterprises (6 procedures with a bid mix). Sector: 74%.n = 6
- The award came in at a median 76% of the estimated value (12 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 81%.n = 12
- Not one of the 18 awards with a known winner country has gone to a foreign company so far. Sector average: 0%.n = 18
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 25/10/2026.
What you must prove — eligibility criteria
From the notice of the same procedure on TED — Tenders Electronic Daily.
124_LD VHB - Eigenerklärung zur Eignung oder Angabe der PQ-Nummer oder Einheitliche Europäische Eigenerklärung (Mit dem Angebot; Mittels Eigenerklärung): Umsatz des Unternehmens in den letzten drei abgeschlossenen Geschäftsjahren, soweit er Leistungen betrifft… read in fullcollapse
Tender documents — direct download
Part of a larger project
- 1. Bauabschnitt, Los 16 BaureinigungDeadline 2 Novthis lot
- 2. BauabschnittDeadline 2 Nov
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| HDFB Hoch-, Dach- und Fassadenbau GmbH · Kemnitz | 6 | 2024–2025 |
| GVV GmbH | 3 | 2025 |
| Hoch-,Tief-Und Gerüstbau GmbH · Stralsund | 3 | 2024–2025 |
| Bau GmbH Heinemann · Bergen auf Rügen | 3 | 2024–2025 |
| ESTRA GmbH Rügen · Bergen | 3 | 2024–2025 |
Contracting authority contact
Tactics
When contracts were awarded in this country and sector, usually about 4 bids came in. A normal field for this market. (Based on 41,486 completed awards — not a statement about this procedure.)
This procedure allows 32 days between publication and deadline — typical in this country is 32 (median of 20,071 procedures). A normal window for this market.
The deadline falls on a Monday — your last full working day is the Friday before. Have evidence and guarantees together by Thursday.
Foreign bidders
In Germany · Cleaning, environment & waste, 45 contracts went to foreign companies over the last 3 years (of 43,631 recorded awards) — mostly from Netherlands, Austria, Belgium.
Submission language: German.
How to bid
Guide: how to apply on cosinex Vergabemarktplatz / DTVP → Registration, signature, fees — from the operator's bidder manual.
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now