Federal Ministry for the Environment, Nature Conservation, Climate Protection and Nuclear Safety - Extension Building - Hollow and Raised Floors DIN 18340 - Award 2017/2026
Bundesministerium für Umwelt, Naturschutz, Klimaschutz und nukleare Sicherheit - Erweiterungsbau - Hohl- und Doppelboden DIN 18340 - Vergabe 2017/2026
Germany · Berlin · how to bid here →
Your path to submission
- Deadline: 30 October at 08:30 — 27 days left.
- The submission point is stated in the notice (link on the right).
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (512 awards, most recently September 2026) — the next award is due around November 2026 by that rhythm. The last award went to Zambelli Metalltechnik.n = 512
- 63% of this buyer's awards went to companies that had already won here before (531 awards since 2018, spread over 187 companies). That is well above the sector norm (40%) — newcomers have a harder time here than elsewhere.n = 531 awards since 2018
- The award came in at a median 64% of the estimated value (6 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 89%.n = 6
- The median procedure drew 3 bids (381 procedures with a bid count); 36% ended with a single bidder. Sector: median 4 bids.n = 381
- Across 56 procedures with structured selection criteria, this buyer most often required: References: works (56 of 56), Professional register enrolment (51 of 56), Average minimum annual turnover (13 of 56), Share of subcontractors (5 of 56).n = 56
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 03/10/2026.
Foreign bidders
In Germany · Construction work, 668 contracts went to foreign companies over the last 3 years (of 241,570 recorded awards) — mostly from Austria, France, Poland.
Typical field: median 3 (from 376 awards).
What the buyer is looking for
An extension of the BMUKN is being built on the Stresemannstraße / Erna-Berger-Straße property in Berlin-Mitte. The building is divided into two 7-storey components A and B, which are connected by a multi-storey bridge. 1. Type and scope of the service Hollow floor approx. 250 m ² hollow floor made of fibre-reinforced calcium sulphate plates, substructure as control room construction made of galvanised steel frame and height-adjustable galvanised steel supports; approx. 90 m ² hollow floor as fibre-reinforced calcium sulphate plates, substructure made of height-adjustable galvanised steel supports; incl. underground cleaning; incl. wall connection tape; approx. 151 m groove millings for underfloor heating incl. filling with filling compound; 4. Pcs. Inspection openings in the hollow floor Double floor approx. 1,150 m ² double floor made of fibre-reinforced calcium sulphate plates with…
Show full description
… linoleum covering, substructure as control room construction made of galvanised steel frame and height-adjustable galvanised steel supports; approx. 1,100 m ² hollow floor made of fibre-reinforced calcium sulphate plates with linoleum covering, substructure made of height-adjustable galvanised steel supports; approx. 280 m ² double floor made of fibre-reinforced calcium sulphate plates with rubber covering, substructure as switchgear construction made of galvanised steel frame and height-adjustable galvanised steel supports; incl. fitting plates, recesses, bores and bridging supports for bridging missing supports; incl. underground cleaning; incl. wall connection tape; approx. 20 m ² double bottom made of steel ventilation panels with infinitely variable ventilation volume control by means of throttle plates, substructure as control room construction made of galvanised steel frame and height-adjustable galvanised steel supports; 285 m cabinet installation frame for control room floor made of C-profiles made of vezinked steel safeguards approx. 1,250 m ² provisional cover of the raised floor from clamping plates; approx. 3,000 m ² protective cover of the hollow/double floor with beverage raton 2. Execution deadlines Start of execution: No later than 12 working days after receipt of the order letter Start on the construction site: 15.02.2027 Completion: 09.02.2029 3. Note - BNB certification For the building, a BNB certification in gold and a BNB certification in silver for the outdoor facilities is sought. The contractor must participate in the successful certification. The contractor must comply with appropriate requirements regarding waste poverty, noise poverty, dust poverty and the requirements of the Federal Soil Protection and Contaminated Sites Ordinance during construction. Furthermore, the requirements listed in Appendix 01 ‘Material requirements’ at quality level 5 shall apply. The contractor must declare all materials, products, by-products, auxiliary products and components intended for use with regard to their ingredients or properties. For this purpose, Appendix 02 ‘Declaration tables’ must be completed in digital form (Excel file format) and the associated technical data sheets and safety data sheets must be assigned and enclosed in accordance with 1907/2006/EC (also in digital form).
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Paul Becker GmbH | 10 | 2025–2026 |
| Energieanlagen Nord GmbH | 9 | 2024–2025 |
| BplusL Infra Log GmbH | 9 | 2020–2024 |
| FLZ Stahl & Metallbau Lauterbach GmbH | 8 | 2025 |
| Hans Timm Fensterbau GmbH & Co. KG · Berlin | 7 | 2024–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on e-Vergabe des Bundes (evergabe-online.de) → Registration, signature, fees — from the operator's bidder manual.