Framework Agreement on Economic Law Brief Opinions in the Field of Energy Regulation
Rahmenvereinbarung über wirtschaftsrechtliche Kurzgutachten im Bereich der Energieregulierung
Germany · Mainz · how to bid here →
Your path to submission
- Deadline: 13 October at 08:00 — 9 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: DEU.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (114 awards, most recently August 2026) — the next award is due around October 2026 by that rhythm. The last award went to ANUVA Stadt- und Umweltplanung GmbH.n = 114
- The median procedure drew just one bid (357 procedures with a bid count); 58% ended with a single bidder. Sector: median 4 bids.n = 357
- 57% of this buyer's awards went to companies that had already won here before (368 awards since 2017, spread over 157 companies). 43% went to new names.n = 368 awards since 2017
- The award came in at a median 76% of the estimated value (7 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 78%.n = 7
- 63% of the bids received came from small and medium-sized enterprises (106 procedures with a bid mix). Sector: 77%.n = 106
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 27/09/2026.
Foreign bidders
In Germany · Business services, 346 contracts went to foreign companies over the last 3 years (of 29,214 recorded awards) — mostly from Belgium, Italy, United Kingdom.
Submission language: DE.
Typical field: median 1 (from 119 awards).
What the buyer is looking for
The summary in English is being prepared. The official description below is in the original language (DE).
Show original description (DE)
Siehe Leistungsverzeichnis i.V.m. Leistungsbeschreibung
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in German.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Rohde & Schwarz GmbH & Co KG | 18 | 2024–2026 |
| GDV Gesellschaft für geografische Datenverarbeitung | 17 | 2010–2025 |
| LS telcom AG | 15 | 2009–2025 |
| i.syde Informationstechnik GmbH · Balge | 12 | 2006–2022 |
| Omninet GmbH · Eckental | 12 | 2013–2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on e-Vergabe des Bundes (evergabe-online.de) → Registration, signature, fees — from the operator's bidder manual.