Overall Performance
Gesamtleistung
Germany · Bonn · how to bid here →
Your path to submission
- Deadline: 15 October at 10:00 — 11 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: German.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every month (14 awards, most recently May 2026) — by that rhythm the next award was due around July 2026. The last award went to Fraunhofer-Institut für Werkstoffmechanik IWM als Institut der Fraunhofer-Gesellschaft zur Förderung der angewandten Forschung e.V., München.n = 14
- 7% of this buyer's awards went to companies that had already won here before (15 awards since 2019, spread over 14 companies). That is well below the sector norm (41%) — this buyer switches suppliers more often than others.n = 15 awards since 2019
- The median procedure drew just one bid (15 procedures with a bid count); 93% ended with a single bidder. Sector: median 1 bids.n = 15
- Not one of the 15 awards with a known winner country has gone to a foreign company so far. Sector average: 4%.n = 15
- From notice to award takes a median 135 days here (12 procedures). Sector: 122 days.n = 12
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Germany · R&D services, 157 contracts went to foreign companies over the last 3 years (of 3,946 recorded awards) — mostly from Netherlands, Italy, Belgium.
Submission language: DE.
Typical field: median 1 (from 14 awards).
What the buyer is looking for
The research project aims to gain in-depth knowledge of influencing factors on subjective safety at small train stations. For this purpose, objective and subjective data as well as investigations are carried out under real and experimental conditions. Combined analyses result in evidence-based prioritisation of measures with the greatest possible impact on people's sense of security. In the project, an evidence-based model is developed to explain subjective safety at small stations. So far, little data has been available for such small stations. At the same time, increasing avoidance tendencies can be observed there. The preoccupation with subjective safety is relevant because (1) the risk of becoming a victim of a crime at stations is low, but the sense of security is still poor, and (2) measures aimed at higher objective safety can differ substantially from those aimed at improving…
Show full description
… subjective safety - these are two largely independent and independent aspects. For example, more surveillance and police presence can reduce offences and thus increase objective security, but at the same time increase the feeling of insecurity because they signal danger. The project is based on a theory-driven, comprehensive data collection with large, heterogeneous samples, combined with objective context factors and experimental investigations. Particular attention is paid to interactions between influencing factors as well as differences between social groups. On this basis, evidence-based measures for the targeted improvement of the sense of security are to be prioritized and presented to the public.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| quattron GmbH · Bamberg | 2 | 2025 |
| Firma KISTERS AG | 1 | 2019 |
| LUB Consulting GmbH · Essen | 1 | 2025 |
| DRO Deutsche Rail Operations GmbH | 1 | 2024 |
| d-fine GmbH · Frankfurt am Main | 1 | 2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on e-Vergabe des Bundes (evergabe-online.de) → Registration, signature, fees — from the operator's bidder manual.