Qualification system for the establishment of biogas feed-in systems (BGEA)
Qualifizierungssystem für die Errichtung von Biogaseinspeiseanlagen (BGEA)
Germany · Oldenburg · how to bid here →
Your path to submission
- Deadline: 31 December 2030 at 16:00 — 1547 days left.
- You submit on Vergabemarktplatz (cosinex) — not here and not by e-mail. ↗ Free bidder account on the cosinex platform required (created instantly); offers go through the bidding tool, usually plain text form suffices — no qualified signature. Sort out account and signature first — not on submission day.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- 42% of this buyer's awards went to companies that had already won here before (32 awards since 2018, spread over 19 companies). 58% went to new names.n = 32 awards since 2018
- The median procedure drew 3 bids (17 procedures with a bid count); 18% ended with a single bidder. Sector: median 4 bids.n = 17
- Across 11 procedures with structured selection criteria, this buyer most often required: Quality management (6 of 11), Professional liability insurance (3 of 11), References: works (3 of 11), Independent quality certificate (e.g. ISO 9001) (3 of 11).n = 11
- Not one of the 32 awards with a known winner country has gone to a foreign company so far. Sector average: 0%.n = 32
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Germany · Construction work, 672 contracts went to foreign companies over the last 3 years (of 242,267 recorded awards) — mostly from Austria, Poland, France.
Typical field: median 3 (from 227,867 awards).
What the buyer is looking for
en and indication of the extent to which the respective services themselves / in a working group / by subcontractors have been / will be carried out: - Project location - Plant components - Short specifications - Volume flow - Project management of the overall measure - Scope of the service provided (list) Methods used to check compliance with the individual requirements The assessment of the requested information and evidence to check the applicant's performance, reliability and expertise and compliance with the requirements of this qualification system will be carried out in accordance with the application documents. The exclusion criteria can be found in the application documents to be requested. If necessary, the client may request further documents in the event of a lack of plausibility of information or for clarification.
Eligibility analysis from the tender documents
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Quathamer GmbH · Bockhorn/Grabstede | 4 | 2024–2025 |
| EGE Deutshland GmbH | 2 | 2024 |
| Trench Austria GmbH · 4060 AT | 2 | 2024 |
| Gartenbau Spiekermann | 2 | 2024–2025 |
| TBD Technische Bau Dienstleistungen GmbH & Co. KG · Friedeburg | 2 | 2017–2023 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on cosinex Vergabemarktplatz / DTVP → Registration, signature, fees — from the operator's bidder manual.