A5014024 - Oostende, renovatie collector afwaarts PL Opex
Belgium · how to bid here →
Your path to submission
- Deadline: 17 November at 11:00 — 41 days left.
- You submit on BDA / e-Procurement Belgium — not here and not by e-mail. ↗
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- 0% of this buyer's awards went to companies that had already won here before (15 awards since 2022, spread over 4 companies). That is well below the sector norm (14%) — this buyer switches suppliers more often than others.n = 15 awards since 2022
- The median procedure drew 3 bids (10 procedures with a bid count); 30% ended with a single bidder. Sector: median 4 bids.n = 10
- 13% of awards went to companies from abroad (15 awards with a known winner country). Sector average: 11%.n = 15
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Belgium · Construction work, 234 contracts went to foreign companies over the last 3 years (of 2,596 recorded awards) — mostly from France, Germany, Italy.
Typical field: median 4 (from 1,507 awards).
What the buyer is looking for
A5014024 - Ostend, collector's renovation downhill PL Opex. The work consists of 2 parts: - On the one hand, the renovation of the downward strand (D1200) after the press line coming from Pompstation Opex/Vismijn in Ostend. - The other part of this project is filling 2 strands of asbestos cement and breaking up the superstructure of the inspection pit between them + filling the rest of this well. After all, the condition of the strands and the location do not lend themselves to simply removing them. Both the pipe to be renovated and the strands to be filled are made of asbestos cement. In order to be able to carry out the works, an extension must be made to the future press management. This extension can be connected to the flange on the end of the line. The pressure pipe must be extended to 2 wells further so that a valve can be placed in the 1st down well.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Deckx Algemene Ondernemingen | 1 | 2022 |
| Smet GWT Europe | 1 | 2022 |
| Colas Noord | 1 | 2022 |
| Mols Contractors | 1 | 2022 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.